Similar Projects
Office Flooring Removal / Installation
Post-Bid
Glendale, AZ

Mechanical Work, Roof Repairs and Wood Flooring
Post-Bid
Ajo, AZ

WUPA - Visitor Center Asbestos Removal
Results
Less than $25,000 est. value
Flagstaff, AZ

Canyon De Chelly, Requires the Services of Hazard
Results
Chinle, AZ

Remediation and Restoration Services
Term Contract
Post-Bid
Flagstaff, AZ

Z--Replace Flooring
Results
Less than $25,000 est. value
Coolidge, AZ 85128

Interior Remodel of Module Buildings
Post-Bid
Window Rock, AZ

Removal, Destruction and Disposal of Aqueous Film-Forming Foam (AFFF).
Results
Abbeville, AL

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Pima, AZ

S--Hazardous Waste/Sharps Collection & Disposal
Results
Tucson, AZ 85723

Z--Construction Hazmat Response IDIQ
Post-Bid
Less than $35,000,000 est. value

GRCA - Hazardsous Waste Disposal
Results
Grand Canyon, AZ 86023

Flooring at Alta Vista and Washington
Post-Bid
Phoenix, AZ 85051

Bldg 20/21 Flooring
Results
Phoenix, AZ 85034

Asbestos Abatement - Fort Apache
Post-Bid
Fort Apache, AZ 85926

Reported 12/06/2018 12:00 AM
Project Title

Middle School Asbestos Tile Removal Project

Physical Address View project details and contacts
City, State (County) Bullhead City, AZ   (Mohave County)
Category(s) Environmental, Single Trades
Sub-Category(s) Flooring, Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Asbestos abatement - remove and replace VCT Tile to include: 1. Removal of approximately 13,000 sq. ft. of 12" x 12" floor tile/ black/yellow mastic in school building and gym. 2. Transport and dispose of abatement debris and asbestos containing materials at a licensed EPA Certified TSD facility. 3. Perform clearance air sampling after abatement completed. 4. Replace approximately 13,000 sq. ft. of 12" x 12" VCT floor tile. 5. Remove and Replace rubber cove base. 6. Permits/Engineering/Drawings/Hazardous Material Fees.
Details
Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents