Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

St. Croix River - Danbury, St. Croix River Bridge, B-07-0006
Renovation, Infrastructure
Bidding
$750,000 to $999,999 est. value
Webster, WI

Parking Lot F Improvements - Green Bay Campus
Infrastructure
Bidding
$750,000 est. value
Green Bay, WI 54303

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

Parking Area Graveling And Drainage
Post-Bid
Friendship, WI 53934

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

T. Wrightstown, Cth Zz, Clay Street - Mallard Road
Results
WI

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

North Eau Claire Street
Infrastructure
Bidding
$3,000,000 est. value
Mondovi, WI 54755

Replace Some Sidewalks Around the Courthouse Building
Post-Bid
Neillsville, WI

Spring Green - Madison, Walter Road
Results
WI

Neillsville Improvement Corporation O'Neill Creek Trailhead
Infrastructure
Bidding
$180,000 est. value
Neillsville, WI

Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Pavement 2-22 Elmore Street Reconstruction
Infrastructure
Bidding
$300,000 est. value
Green Bay, WI 54303

Last Updated 05/05/2022 11:55 PM
Project Title

2022 Sidewalk Replacement Program

Physical Address View project details and contacts
City, State (County) Grafton, WI   (Ozaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 5777.0 SF 4” Concrete Sidewalk (Remove and Replace) Approximately 80.0 SF 5” Concrete Sidewalk/Driveway (Remove and Replace) Remove and Replace Sidewalk Construction A. Removal Existing sidewalk shall be removed at the locations marked, and disposed of by the contractor. Any existing concrete sidewalk abutting a marked slab that has chips, pops, or cracks, shall be saw cut cleanly. Saw cutting and removal of existing sidewalk shall be considered incidental work and included in the price bid for sidewalk removal and replacement. Unmarked sidewalk that is damaged in the process of removal shall be completely removed and replaced at the expense of the contractor.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents