Similar Projects
Norwalk High School
New Construction - 328,407 SF
Conception
Rocky Hill, CT 06067

Old Greenwich School Renovations
Renovation
Conception
$24,000,000 est. value
Greenwich, CT 06870

Brown Intermediate & Polson Middle Courtyard/Entry/Main Office
New Construction, Renovation
Design
Madison, CT 06443

Torrington High School Construction
New Construction - 300,000 SF
Design
$159,000,000 est. value
Torrington, CT

Bulkeley High School Phase 6A of 9
Renovation
Bidding
$330,000 est. value
Hartford, CT 06114

Design/Build - Build and Construct New Press Box / Storage at Trumbull High School Soccer File
New Construction
Bidding
$130,000 est. value
Trumbull, CT 06611

Windham High School Renovate As New Project
Renovation, Addition - 228,696 SF
Post-Bid
$93,305,000 est. value
Windham, CT 06226

Additions and Renovations to John F. Kennedy Middle School
Renovation, Addition - 162,000 SF
Post-Bid
$71,800,000 est. value
Enfield, CT 06082

New Fairfield Schools Construction Project
New Construction, Renovation, Addition - 180,000 SF
Results
$113,400,000 est. value
Danbury, New Fairfield, CT 06812

Main Entryway Improvements
Renovation
Results
$953,500 est. value
Cheshire, CT 06410

Platt Tech
New Construction - 237,000 SF
Construction
$92,000,000 est. value
Milford, CT

Athletic Facility Improvements - East Hampton High School
Renovation
Construction
East Hampton, CT 06424

New Northeast Middle School
New Construction
Conception
Bristol, CT 06010

Killingly Memorial School Renovation & Addition
Renovation, Addition - 18,950 SF
Design
$27,200,000 est. value
Killingly, CT 06239

Amity Middle School Bethany Interior Courtyard Repair Services
Renovation
Bidding
$179,000 est. value
Bethany, CT 06524

Reported 04/21/2022 02:24 PM
Project Title

New High School

Physical Address View project details and contacts
City, State (County) North Branford, CT 06471   (New Haven County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced October 2021
Bids Due View project details and contacts
Estimated Value $56,900,000 to $66,242,390
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Middle/Senior High School, to 106,100 SF New Construction Building.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents