Similar Projects
Last Updated | 01/11/2022 10:35 AM |
Project Title | Storm Sewer Liner |
Physical Address | View project details and contacts |
City, State (County) | WI (Marathon County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The goal of the project is to line the existing metal storm sewer outlet and fill the voids in the soil around the pipe with polyurethane hydrophobic grout. The work is anticipated to include the following: 1. UV GRP CIPP 48” - Lining of the full length of the Storm Sewer horizontal outfall with a watertight termination at the vertical riser pipe in accordance with the attached specification. 2. Soil stabilization and void filling around the exterior of the culvert pipe for the full length of the storm sewer using Green Mountain International U 4.0 dual component Mountain Grout (or equal product). 3. Optional Add-on cost for lining the vertical riser pipe and installing a watertight termination at the inlet |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |