Similar Projects
Parking Lot Improvements Salmo Pond County Park
Infrastructure
Bidding
Black Earth, WI 53515

2022 Depot Street Reconstruction
Infrastructure
Bidding
Spencer, WI 54479

Fresh Coast Green Schoolyards Program: MMSD GI Service Area
Renovation
Post-Bid
Milwaukee, WI 53204

Sewer, Water Main, and Street Construction
Post-Bid
Neenah, WI 54956

Resurface & Expand Privately Owned Vehicle Parking - MEP
Results
$340,000 est. value
Eau Claire, WI 54702

Sanitary Sewer Relay
Renovation
Results
Krakow, WI

Village Center 2nd Addition Utility and Roadway Construction
Infrastructure
Bidding
Howard, WI

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

Marlboro Street Storm Sewer
Results
Edgerton, WI 53534

2022 Cleaning and Televising
Infrastructure
Bidding
Janesville, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Sanitary and Storm Relays
Results
West Allis, WI 53214

2022 Haskell Street Reconstruction (West Street to Madison Street)
Infrastructure
Bidding
Beaver Dam, WI 53916

Storm Sewer Improvements - Columbia County Courthouse
Post-Bid
Portage, WI 53901

Tanager Street Extension
Renovation
Results
Waupun, WI 53963

Last Updated 01/11/2022 10:35 AM
Project Title

Storm Sewer Liner

Physical Address View project details and contacts
City, State (County) WI   (Marathon County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of the project is to line the existing metal storm sewer outlet and fill the voids in the soil around the pipe with polyurethane hydrophobic grout. The work is anticipated to include the following: 1. UV GRP CIPP 48” - Lining of the full length of the Storm Sewer horizontal outfall with a watertight termination at the vertical riser pipe in accordance with the attached specification. 2. Soil stabilization and void filling around the exterior of the culvert pipe for the full length of the storm sewer using Green Mountain International U 4.0 dual component Mountain Grout (or equal product). 3. Optional Add-on cost for lining the vertical riser pipe and installing a watertight termination at the inlet

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents