Similar Projects
Transformers and Vacuum Switches
Term Contract
Bidding
TX

Distribution Line Clearance, Street and Nightwatchman Lights
Term Contract
Post-Bid
Austin, TX 78767

Permanent Generators Installation
Post-Bid
Hempstead, TX 77445

Campus Switch Upgrades - Phase 2 (Austin ISD E-Rate Project)
Results
Less than $4,000,000 est. value
Austin, TX 73301

ACT Emergency Generator Project
Results
Waco, TX 76702

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Back-Up Generator Preventative Maintenance and Repair
Term Contract
Results
Argyle, Copper Canyon, Flower Mound, Hickory Creek, Lake Dallas, Lewisville, Little Elm, TX 75057

Electrical Maintenance and Repair - Waco
Post-Bid
Belton, Gatesville, Hamilton, Hillsboro, Marlin, Mexia, Temple, Waco, TX 76513

General Electrical Services
Term Contract
Results
$50,000 est. value
Lewisville, TX 75057

CMAR UNT Coliseum MEP Renovation Phase 1
Post-Bid
Denton, TX 76201

Lightning Protection System
Results
Less than $14,780 est. value
Austin, TX 78767

Purchase, Installation and Relocation of Emergency Standby Generator No. 21-13
Alteration
Post-Bid
Huntsville, TX 77340

Hot Water Generator/Tank
Results
$29,910 est. value
Abilene, TX 79601

Electrical Testing Services
Alteration
Post-Bid
Canyon, College Station, Commerce, Corpus Christi, Galveston, Houston, Killeen, Kingsville, Laredo, McAllen, Prairie View, San Antonio, Stephenville, Texarkana, TX

362 Kv Coupling Capacitor Voltage Transformer (Ccvt)
Results
Austin, TX 78767

Last Updated 09/22/2021 02:31 PM
Project Title

Uvalde Design Build Solar Pv

Physical Address View project details and contacts
City, State (County) Uvalde, TX   (Uvalde County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $85,000,000 to $105,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of providing all labor, equipment, supplies and materials, to perform the following work at the Uvalde National Fish Hatchery (NFH) in accordance with these plans and specifications: 1. Design a 45Kw-AC solar photo-voltaic (PV) electric generation system in accordance with these plans and specifications and in accordance with the 2017 NEC (NFPA-70). The design shall include detailed engineered drawings showing the PV array structural details, electrical equipment installation details, wire sizes, grounding details, and equipment technical cut-sheets. This shall also include acquiring the appropriate local utility’s Inter-connection agreement for the full 45Kw-AC PV generation system and obtain the new applicable utility rate tariff schedule. 2. Install ONLY, a fully operational, 30Kw-AC, grid-tied, PV system for the hatchery headquarters office/visitor center building in accordance with the approved design submittal. The remaining 15Kw-AC PV generation system will be install the future when the funds become available. 3. 3. The project also includes working with the local electric utility provider to provide all additional equipment required to connect the new PV electrical generation system to the local utility grid.

Details

Division 26 - Electrical.
Division 48 - Electrical Power Generation, Commissioning of Electrical Power Generation, Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Solar Energy Collectors, Amorphous Solar Energy Collectors, Electrical Power Control Equipment, Electrical Power Generation Solar Tracking Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents