Similar Projects
Water Tower Paint Rehabilitation
Post-Bid
$285,000 est. value
Suamico, WI

Huber Center Painting
Post-Bid
Portage, WI 53901

Water Reservoir Painting
Renovation
Post-Bid
Oregon, WI

100,000-Gallon Elevated Tank Repainting
Post-Bid
Monona, WI

Tower 2 Exterior Recoating
Results
Altoona, WI

Water Reservoir Painting
Post-Bid
Less than $250,000 est. value
Irma, WI 54442

Remodeling and Repairs at 3936 N 25th Street
Renovation
Post-Bid
Milwaukee, WI 53206

2021 Time & Material Parks Facilities
Term Contract
Post-Bid
Milwaukee, WI

250,000 Gallon Water Storage Tank Paint Recoating
Renovation
Results
Freedom, WI

Wirth Park Pool Painting
Post-Bid
Brookfield, WI 53005

Cleaning, Repairing, And Painting
Renovation
Results
Marshfield, WI

Reported 04/20/2021 12:00 AM
Project Title

Interior Painting at WFO in Green Bay, WI

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54313   (Brown County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Brief Description: The Contractor shall provide all labor, materials, tools and supervision of qualified personnel to paint the Upper Air Inflation Building (UAIB) interior in accordance with this statement of work. The work will encompass prepping, cleaning, priming, and painting the interior of the UAIB. Description of Work: 1. Remove all loose paint with wire brush 2. Prep and clean all surfaces ready for paint 3. Prime all surfaces with a rust inhibiting primer 4. Coat all surfaces with 2 coats Sher-Cryl HPA High performance acrylic or greater 5. Coordinate work with Site contact. Hydrogen bottles will need to be removed prior to starting work. Provide a detailed schedule so Hydrogen bottles can be replaced. 6. Approximate area of inflation building is 1200 Sq. Ft. 7. Approximate area of bottle storage building is 700 Sq. Ft 8. Match existing colors as close as possible. Tan on walls and Dark Brown on Walk doors 9. A designated COTR shall make a full inspection to see that the contract is completed per the statement of work. Items of inspection will include and are not limited to verifying good adhesion on painted surfaces, integrity of sealed joints and proper clean-up. 10. The finished surfaces shall be free from runs, drips, drops, ridges, and color variations. Any surfaces not free of deficiencies shall be stripped and repainted as specified at no cost to the Government. 11. Furnish not less than one full gallon of each type and color of paint, used in this project. Identify all containers individually with appropriate labels. 12. Pictures are of existing building for reference.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents