Similar Projects
Last Updated | 01/09/2023 01:36 PM |
Project Title | Post Brook Dam Improvements |
Physical Address | View project details and contacts |
City, State (County) | Ringwood, NJ 07456 (Passaic County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $58,689 [brand] Estimate |
Plans Available from | Agency's Affiliate - 11/22/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Post Brook Dam is part of the North Jersey District Water Supply Commission's facilities located in Wanaque, Passaic County, New Jersey. The dam is located in Ringwood, New Jersey within the Wanaque Reservoir lands. The Post Brook Dam was built circa 1927. The dam was completed in late 1927 and is approximately 120 feet long and 10 feet high. The dam is a mortared stone masonry gravity dam that is founded on bedrock. The typical dam cross section consists of a vertical upstream face, approximately 5-foot wide crest and a 1H:2V sloping downstream face. The dam also has a gatehouse with two outlet structures housed inside that discharge a certain passing flow for the lake downstream. The Scope of Work is to include, but not be limited to, outlet works replacement, reconstructing the downstream face of the dam to include leak repairs, masonry cleaning, joint re-pointing, masonry unit resetting, and masonry re-building The Successful Bidder shall be licensed in the State of New Jersey, shall have and provide upon request, demonstrable experience with general construction, masonry and dam repair. Bidders shall include references and at least ten (10) similar projects completed within their bids submitted to the Commission. In addition, the firm must own and maintain a local office within 100 miles of the Commission. Bidders are required to comply with regulations of the "New Jersey Local Public Contract Law" (N.J.S.A. 40A:11-1 et. seq.), Affirmative Action Regulations N.J.S.A. 10:5-31 et seq., N.J.A.C. 17:27 et seq., The New Jersey Prevailing Wage Act N.J.A.C. 12:60-2.1 and 6.1 et. Seq., N.J.S.A. 34:11-56.25 et. seq.) and the New Jersey Contractor Business Registration Certificate N.J.S.A. 52.32-44. Sealed Bids: Each bid submission must be enclosed in a sealed envelope addressed to: North Jersey District Water Supply Commission One F.A. Orechio Drive Wanaque, New Jersey 07465 Attention: Margaret M. Maddalena, Contract Administrator The information below must be clearly shown on the outside envelope of all bids: CONTENTS - SEALED PUBLIC BID CONTRACT NUMBER: #2099 TITLE: POST BROOK DAM IMPROVEMENTS BID TIME AND DATE: THURSDAY, JANUARY 5, 2023 QUESTION CUT OFF DATE: THURSDAY, DECEMBER 8, 2022 BIDS FORWARDED VIA OVERNIGHT SERVICES SHALL INDICATE THAT A SEALED BID IS CONTAINED THEREIN. The Commission will assume no responsibility for bids, which are not properly labeled, whether delivered by the bidder or the bidder's representative, or sent by mail or courier service. Bid Security: Each bid shall be accompanied by a certified check, cashier's check or bid bond for ten (10%) percent of the contract price (not to exceed $20,000) as a guarantee of execution of contract and the provision of performance security. Surety's Consent: Every bid must be accompanied by the consent in writing of a surety company (or surety companies) qualified to do business in the State of New Jersey, who shall, at the time of submission of such bid, qualify as to its (or their) responsibility in an amount equal to ONE HUNDRED PERCENT (100%) of the contract price of such bid., All bidders are considered to have full knowledge of the conditions and requirements, including the physical characteristics of the site and the project, which are necessary for an accurate bid. The Bidder shall be held to be aware of the Commission's requirements prior to the time of submitting bids and to have appraised all conditions under which the Contract is to be performed. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |