Similar Projects
Water, Sanitary Sewer, and Drainage Facilities for Sunset Crossing Section 4
Post-Bid
TX

Water, Sanitary Sewer, Storm Sewer, and Paving to Serve Rainsong Section Three-B and Central Park Boulevard
Post-Bid
Texas City, TX 77591

Construction of Water Distribution, Wastewater Collection and Storm Water Facilities to Serve Fosters Ridge, Section Sixteen and Fosters Ridge, Section Seventeen
Results
TX

Repair Airfield Drainage
Results
$15,000,000 to $25,000,000 est. value
Del Rio, TX 78843

Rehabilitation of Outfall 32
Post-Bid
Hunters Creek Village, TX 77024

Boggy Creek-MLK TOD Stormwater Conveyance Improvements Phase 1
Results
$2,800,000 est. value
Austin, TX 73301

Replace Seized 6" Diveter Storm-Water Diverter Valve RPL
Post-Bid
Galveston, TX 77550

Sewer Lines CIPP
Results
$500,000 to $1,000,000 est. value
San Angelo, TX

Wolf Ranch West Section 1A Reinforced Concrete Pipe (RCP) Joint Repair
Post-Bid
TX

Storm Sewer, Sanitary Sewer and Water Lines to serve Kendall Lakes Section 10
Results
TX

Storm Sewer, Sanitary Sewer, Water Line Mitigation Basin, and Storm Sewer Pump Station to Serve Mustang Ridge Sections One and Two
Post-Bid
TX

Construction of the Southbelt (Phase 3) and Dagg Road Stormwater Detention Basins
Results
Less than $16,957,294 est. value
Houston, TX 77092

Repair Drainage at Shorthorn Airfield, North Fort Hood (NFH)
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Hood, TX 76544

Storm Sewer and Culvert Cleaning
Results
Less than $184,600 est. value
TX

I-45 Scarsdale Business Park
Post-Bid
Houston, TX 77002

Last Updated 07/28/2021 08:02 AM
Project Title

Hallettsville Dowling Street Drainage

Physical Address View project details and contacts
City, State (County) Hallettsville, TX   (Lavaca County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $221,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Principal items of construction include 1,340 LF of grading of earthen ditches, installation of 76 LF of 48” Arch RCP storm sewer, 273 LF of 24” Arch RCP storm sewer, 74 LF of 15” Arch RCP storm sewer, and all necessary appurtenances.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents