Similar Projects
2022 Concrete Replacement and Related Work - LHA Locations
Alteration
Bidding
Akron, OH

2022 Concrete Program
Alteration
Bidding
$282,000 est. value
Moraine, OH

Concrete
Term Contract
Post-Bid
Conneaut, OH 44030

500 Cu. Yd. Portland Cement Concrete
Post-Bid
Lima, OH

Concrete Repairs and Replacement
Results
Columbus, OH

2020 Concrete Program
Results
$72,198 est. value
Richfield, OH 44286

Annual Concrete Repair Program
Alteration
Bidding
Solon, OH

706 Reinforced Concrete Pipe
Post-Bid
OH

Concrete Mixes and Maint Products
Results
Less than $50,000 est. value
Columbus, OH 43215

Reinforced Four Sided Concrete Box
Alteration
Bidding
OH

Concrete Restoration Work of Water and Sewer Lines 2021 and 2022
Term Contract
Post-Bid
Niles, OH

Bikeshare Expansion 2020 Concrete Pads
Results
Columbus, OH

2022 Concrete Repair and Resurfacing
Alteration
Bidding
Hamilton, OH

Concrete Products
Post-Bid
OH

Franklin County Corrections Center Continuation Phase 2A, Bid Release #1A
Results
Less than $13,494,663 est. value
Columbus, OH 43215

Last Updated 01/31/2022 10:49 AM
Project Title

Loading Dock & Parking Garage Concrete Repairs Project

Physical Address View project details and contacts
City, State (County) Akron, OH 44308   (Summit County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

U.S. General Services Administration (GSA) is seeking to contract the procurement for addressing notable deterioration of concrete in the loading dock and parking garage areas, including removal, replacement, and/or repair of concrete spalling and cracks, reinforcement, waterproofing, and other elements. Additionally, relocation of the existing guard house, installation of a new guard house, as well as applicable conduit and wiring as necessary, temporary removal and reinstallation of card readers, and trench drains work are also within the scope. Providing temporary facilities and ensuring continuity of operations for telecommunication and electrical equipment are also requirements of the contract.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents