Project Title | Goodwin Park Irrigation and Booster Pump Improvements |
Physical Address | View project details and contacts |
City, State (County) | Hartford, CT 06114 (Hartford County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,450,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of booster pump assembly, prefabricated structure, well replacement and controls and installation of new irrigation systems at Goodwin Park Golf Course (27 holes) project is being as base bid and 3 add alternates. Q&A Deadline 12/02/2022 2:00 PM (EST)) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages 1000 Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. For adjustment of the Contract Sum, track and provide supporting documentation (delivery or removal/disposal tickets) as deemed necessary to confirm Unit quantities provided or removed. Such quantities shall be tracked against any specific "Allowance" line item which may be included within the base contract value. Contractor must report status of Unit Price Allowances regularly and not exceed such allowance value without prior authorization from the Owner. Unit Price that does not have an allowance applied to it shall be treated with a CCD until all quantities have been determined. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. Should it be determined that the work measured by the independent surveyor is five (5) or more percent less than the Contractor's reported measurement, Contractor shall be responsible for the cost associated with the independent survey and adjustment to the measurement . Only those change orders that have been fully executed by all parties shall be listed and allowed to be a part of the month's billing. Should the Contractor list a change order prior to full execution and receipt back, regardless if the application has been certified by the Engineer, the Owner shall not be responsible for any delays in payment and shall have the right to reject the application and ask for a resubmission with removal of any change orders as deemed warranted. Owner's Recourse: Written warranties made to the Owner are in addition to implied warranties, and shall not limit the duties, obligations, rights and remedies otherwise available under the law, nor shall warranty periods be interpreted as limitations on time in which the Owner can enforce such other duties, obligations, rights, or remedies. Rejection of Warranties: The Owner reserves the right to reject warranties and to limit selections to products with warranties not in conflict with requirements of the Contract Documents. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |