Similar Projects
Steele Street Pump Station Upgrades - City of New Britain
New Construction, Infrastructure
Conception
$450,000 est. value
New Britain, CT 06052

Whites Bridge Pond Station Improvements - City of New Britain
Renovation
Conception
$6,000,000 est. value
New Britain, CT

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

Burritt Library Renovation / Addition (Library Annex) Central
Addition, Demolition, Renovation, Infrastructure
Bidding
$13,499,745 CJ est. value
New Britain, CT 06051

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure
Bidding
$55,000,000 CJ est. value
Newington, CT 06111

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

Construction Of The Old Lyme Shared Sewer Infrastructure At Pump Station
New Construction
Post-Bid
Manchester, CT

Plantsville Pump Station Rehabilitation Project
Renovation
Results
$825,000 est. value
Southington, CT 06489

Riverdale Farms Sanitary Sewer Pump Station Upgrades
Renovation
Results
$250,633 est. value
Avon, CT 06001

Enfield Street School and Henry Barnard School Parking Lot Improvements
Infrastructure
Construction
$570,180 CJ est. value
Enfield, CT 06082

Farmington High School and FPS Central Office Projects - General Trades
Term Contract, Demolition, New Construction, Renovation, Infrastructure - 239,500 SF
Construction
$4,804,700 CJ est. value
Farmington, CT 06032

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

The Byline Luxury Apartments
Term Contract, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
West Hartford, CT 06107

Mountain Road, Albany Avenue Intersection - City of West Hartford
Infrastructure
Conception
$1,600,000 CJ est. value
West Hartford, CT 06117

Last Updated 12/12/2022 11:34 AM
Project Title

Goodwin Park Irrigation and Booster Pump Improvements

Physical Address View project details and contacts
City, State (County) Hartford, CT 06114   (Hartford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of booster pump assembly, prefabricated structure, well replacement and controls and installation of new irrigation systems at Goodwin Park Golf Course (27 holes) project is being as base bid and 3 add alternates. Q&A Deadline 12/02/2022 2:00 PM (EST)) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages 1000 Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. For adjustment of the Contract Sum, track and provide supporting documentation (delivery or removal/disposal tickets) as deemed necessary to confirm Unit quantities provided or removed. Such quantities shall be tracked against any specific "Allowance" line item which may be included within the base contract value. Contractor must report status of Unit Price Allowances regularly and not exceed such allowance value without prior authorization from the Owner. Unit Price that does not have an allowance applied to it shall be treated with a CCD until all quantities have been determined. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor. Should it be determined that the work measured by the independent surveyor is five (5) or more percent less than the Contractor's reported measurement, Contractor shall be responsible for the cost associated with the independent survey and adjustment to the measurement . Only those change orders that have been fully executed by all parties shall be listed and allowed to be a part of the month's billing. Should the Contractor list a change order prior to full execution and receipt back, regardless if the application has been certified by the Engineer, the Owner shall not be responsible for any delays in payment and shall have the right to reject the application and ask for a resubmission with removal of any change orders as deemed warranted. Owner's Recourse: Written warranties made to the Owner are in addition to implied warranties, and shall not limit the duties, obligations, rights and remedies otherwise available under the law, nor shall warranty periods be interpreted as limitations on time in which the Owner can enforce such other duties, obligations, rights, or remedies. Rejection of Warranties: The Owner reserves the right to reject warranties and to limit selections to products with warranties not in conflict with requirements of the Contract Documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.