Similar Projects
Central HS Combes Gym
Renovation
Bidding
Champaign, IL 61820

2021 General Remodeling at Lockport Township High School
Renovation
Bidding
Lockport, IL 60441

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Capital Improvements Phase 1 - Sequence 2.2
Renovation
Bidding
Hillside, Maywood, IL 60153

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

CPS Pre K Package 11
Renovation
Bidding
Chicago, IL 60621

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Robinson Health-Life Safety Improvements
Renovation
Bidding
Robinson, IL 62454

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

ICR - Ceiling Replacement at Roberto Clemente Community Academy High School
Results
Chicago, IL 60622

Last Updated 03/08/2021 11:35 AM
Project Title

Summer 2021 H/LS Improvements

Physical Address View project details and contacts
City, State (County) Wood River, IL 62095   (Madison County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $420,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes renovation of existing toilet rooms including, but not limited to demolition of existing finishes, plumbing fixtures, light fixtures, partitions and accessories as well as the provision and installation of new plumbing fixtures,light fixtures, partitions and accessories. New finishes include quartz epoxy flooring, ceramic walltile, painting and suspended acoustical ceilings.The scope of work also includes new science workstations and flooring - existing asbestos workstations and flooring will be removed by others under separate contract. Mechanical, electrical, plumbing and fire protection work is commensurate with the scope of work. The base bid also includes interior door, frame and hardware replacement and exterior work consisting of brick masonry restoration. ALTERNATE BID #1 includes the provision and installation of an epoxy resin work surface at the teacher's station in the science lab – existing asbestos top will be removed by others under separate contract. Existing cabinetry will remain but is to be encased with new materials as indicated on Drawings. Electrical and plumbing work is commensurate with the scope of work. ALTERNATE BID #2 includes exterior sealant restoration at and power washing of pebble stone precast panels.

Details

Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents