Similar Projects
Bonita School Road Bridge Replacement - Santa Barbara County
New Construction, Infrastructure
Conception
$42,000,000 est. value
Santa Maria, CA 93458

Solstra Mixed Use Development / Solomon Hills
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Santa Barbara, CA 93105

701 N. Milpas Mixed-Use
Demolition, New Construction, Infrastructure - 90,721 SF
Design
$15,800,000 CJ est. value
Santa Barbara, CA 93103

701 N. Milpas Mixed-Use
Demolition, New Construction, Infrastructure - 90,721 SF
Design
$15,800,000 CJ est. value
Santa Barbara, CA 93103

RFP Construction Manger - Construction Management Services For El Estero Water Resource Center Electrical Distribution Renewal Project
Demolition, New Construction, Infrastructure
Sub-Bidding
$20,783,602 CJ est. value
Santa Barbara, CA 93103

RFP D/B - Design Build, Ground Based Strategic Deterrent Re-Entry Vehicle Facility, Vandenberg Space Force Base, CA
New Construction, Infrastructure - 2,322 SF
Post-Bid
$100,000,000 CJ est. value
Lompoc, CA 93436

RFP D/B - Design Build, Ground Based Strategic Deterrent Re-Entry Vehicle Facility, Vandenberg Space Force Base, CA
New Construction, Infrastructure - 2,322 SF
Post-Bid
$100,000,000 CJ est. value
Lompoc, CA 93436

Treat Bridge Decks with Methacrylate and Polyester Concrete Overlays
New Construction, Infrastructure
Results
$890,000 est. value
CA

Downtown De La Vina St Safe Crosswalks and Buffered Bike Lanes and the Eastside Community Paseos Project
Infrastructure
Results
$2,550,000 est. value
Santa Barbara, CA 93101

Cleveland Elementary School New Classrooms and Site Improvements Project
Demolition, New Construction, Infrastructure
Construction
$3,848,000 CJ est. value
Santa Barbara, CA 93103

2022 Street Pavement Digout Project
Infrastructure
Construction
$1,882,176 CJ est. value
Lompoc, CA 93436

In-N-Out - McMurray Road / Buellton
New Construction, Infrastructure - 3,885 SF
Pending Verification
$1,200,000 CJ est. value
Buellton, CA 93427

In-N-Out - McMurray Road / Buellton
New Construction, Infrastructure - 3,885 SF
Pending Verification
$1,200,000 CJ est. value
Buellton, CA 93427

Central City Recreation Center - City of Santa Barbara
Demolition, New Construction, Renovation, Infrastructure
Conception
$21,000,000 CJ est. value
Santa Barbara, CA 93101

Micheltorena Street Condominiums
New Construction, Infrastructure - 8,015 SF
Design
$2,200,000 CJ est. value
Santa Barbara, CA 93103

Last Updated 06/06/2023 05:14 AM
Project Title

RFP Construction Manager - Cabrillo Boulevard Roundabout And Pedestrian And Bicycle Facility Improvements Project

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93103   (Santa Barbara County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $4,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://newspress.com/sb-city-council-to-hear-about-capital-improvements/ SB City Council to hear about capital improvements The Santa Barbara City Council today will receive a status report by the Department of Public Works regarding recently completed capital improvements, as well as projects currently in design or construction. The council will meet in its chambers, 735 Anacapa St., starting at 2 p.m. The city's Capital Improvement Program identifies current and future projects to maintain or improve the city's capital infrastructure, staff wrote in its report to council. The CIP provides a preliminary prioritization of projects for funding in the next five years and identifies project needs for future years. The most recent CIP was presented and approved by council on March 16, 2021, and covered fiscal years 2022 to 2026. There were 14 CIP projects in the construction phase. The total cost for these projects is approximately $44.3 million. These include the Central Library Renovation Project, the Desal Conveyance Main Project and The Thousand Steps Beach Public Access Stairs Improvement Project. Two projects involve Santa Barbara Airport. The first, the Southfield Redevelopment Project, will reconfigure the rental car ready-return lot at the airline passenger terminal, adding roughly 60 car spaces and three overnight aircraft parking spaces. The project scope includes stormwater improvements and airport security improvements. Construction is anticipated to start in early 2023. The second involves SBA Terminal Expansion and Parking Structure, which is currently in the conceptual design phase. Concepts will include expanding the existing airline passenger terminal by roughly 16,000 square feet and adding a multilevel parking structure. The conceptual design phase is scheduled for completion in January 2023, with environmental review and design development to follow. The Central Library Renovation Project will include new lighting, new planters, new drought tolerant landscaping, and a new accessible ramp connecting the upper plaza to the lower plaza with new hardscape throughout. Other features include the ADA-compliant elevator project and renovation of the lower level staff area. The Desal Conveyance Main Project, also known as the Desal Link Project, will install 2.25 miles of 24-inch pipe to connect the Charles E. Meyer Desalination Plant to the Cater Water Treatment Plan. When this project and other supporting projects are complete, the city will be able to distribute desalinated water to the city's entire water service area. And the Thousand Steps Beach Public Access Stairs Improvement Project includes safety repairs and improvements to the historic beach access stairway on the Mesa. Improvements include a new continuous handrail, a new concrete guardrail at the main landing mid-stairway, and the reconstruction of the lower 24 steps and installation of seven new additional steps. The project is substantially complete, but a brief closure for additional work is expected this fall or winter, when conditions allow access. Other projects currently in design or construction include: -- The Downtown De La Vina Street Safe Crosswalks and Buffered Bike Lanes project, which will install a buffered bike lane, replacing one vehicular travel lane on De La Vina Street. In addition, curb extensions, high visibility signs and pavement markings constructed along six intersections are designed to improve sightlines and decrease pedestrian exposure to traffic. -- The Eastside Community Paseos Project, which will provide bike and pedestrian connections within and from the Eastside to the Downtown area. -- Wastewater Main Rehabilitation 2022 Project, which is part of the city's annual program to maintain approximately 257 miles of sanitary sewer infrastructure by utilizing cured-in-place trenchless lining technologies. -- Water Main Replacement FY 21A Project, which will consist of replacing approximately 3.5 miles of aged and/or problematic water main pipes with PVC and ductile iron material, as well as reconnecting residential water services and fire hydrants in coordination with the installation of the new water main. Other CIP projects currently in the design phase include pedestrian and bicycle improvements on Cabrillo Boulevard and the replacement of the Union Pacific Railroad Bridge; replacing the Carpinteria Street Bridge; constructing a new 2.5 million gallon finished water reservoir, or chlorine contact basin and supporting facilities at the William B. Cater Water Treatment Plant; and replacing and updating mechanical and electrical equipment at the Braemar Pump Station. In Fiscal Year 2022, the city completed 12 projects with a total cost of approximately $20.5 million, of which nearly $1.8 million was grant-funded. The remaining $18.7 was city-funded. _________________- Provide construction management services during the construction phase of the Cabrillo Boulevard Roundabout and Pedestrian and Bicycle Facility Improvement Project, including serving as the Project Resident Engineer, Assistant Resident Engineer, performing material testing, and provide labor compliance as detailed in the RFP. The construction phase includes pre-construction, construction, and construction close out. The Project primarily consists of, but is not limited to the following: Removal of existing pavement and portions of existing south east median island; Removal and relocation/replacement of various trees; Relocation of water main; Relocation of sewer main; Installation of new splitter islands; Installation of a new center median apron with raised center landscaped island; Installation of all storm drainage facilities; Installation of street lights; and Protection of existing utilities per the Project's plans and specifications. The Project is funded by local funds and is not subject to federal regulations Type of Award Lump Sum Project Duration 18 months Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Q and A Deadline 10/15/2021 3:00 PM Please contact Eric Goodall, Supervising Civil Engineer, at (805) 897-2615 or EGoodall@SantaBarbaraCA.gov if you have any questions.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents