Similar Projects
Venson Senior Lofts
Addition, New Construction, Infrastructure, Renovation - 19,200 SF
Conception
$17,000,000 CJ est. value
Pittsburgh, PA 15210

Venson Senior Lofts
Addition, New Construction, Infrastructure, Renovation - 19,200 SF
Conception
$17,000,000 CJ est. value
Pittsburgh, PA 15210

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Alcosan Takeover - Rank - Rebid
Infrastructure
Bidding
$150,000 CJ est. value
North Versailles, PA 15137

Plum Street Improvements Phase 6
Infrastructure
Post-Bid
Elizabeth, PA 15037

New Public Works Facilities
New Construction, Alteration
Post-Bid
$100,000 est. value
Swissvale, PA 15218

Design Activities are Limited to: Architectural Retaining Wall
Results
$7,500,000 to $9,999,999 est. value
PA

SR 3048, Noblestown Road Slide Remediation
Results
$1,000,000 to $2,499,999 est. value
PA

Pittsburgh Airport Innovation Campus Site Development Phase 2 at Pittsburgh International Airport
Infrastructure
Construction
Pittsburgh, PA 15231

Castlegate Green / Mount Lebanon
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Pittsburgh, PA 15226

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Fairywood Industrial Development
New Construction, Infrastructure - 150,000 SF
Pending Verification
$7,000,000 CJ est. value
Pittsburgh, PA 15219

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

Last Updated 12/05/2022 03:20 AM
Project Title

Re-Surfacing of Oakwood Avenue (Center to Fenton) Re-Bid

Physical Address View project details and contacts
City, State (County) West View, PA 15229   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $43,379 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 11, 2022, This project is already awarded to Youngblood Paving Inc. with the awarded amount of $43,379.23 Estimated cost ; $29,000 +/- The NHCOG reserves the right to reject any and all bids in whole or in part and to waive any informalities. Bids must be accompanied by a Bid Bond, Cashier's Check, or a Certified Check made payable, without condition, to the NHCOG in an amount no less than 10% of the bid. Cash will not be accepted. Compliance is required with the Davis-Bacon Act and other Federal Labor Standards Provisions; Title VI and other applicable provisions of the Civil Rights Act of 1964; the Department of Labor Equal Opportunity Clause (41 CFR 60-1.4); Section 109 of the Housing and Community Development Act of 1974; Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of Rehabilitation Act of 1973 and Americans with Disabilities Act of 1990; and the Allegheny County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran-Owned Small Businesses. Further, notice is hereby given that this is a Section 3 Project under the Housing and Urban Development Act of 1968 (as amended) and must to the greatest extent feasible, utilize lower income residents for employment and training opportunities and Section 3 Business concerns and all contracts and subcontracts for this project shall contain the "Section 3 Clause" as set forth in 24 CFR, Part 135.38. Moreover, compliance is required by the prime contractor and all subcontractors with the Federal General Conditions included in the contract documents between ACED and the operating agency. These Federal General Conditions are to be incorporated by reference into all construction contracts between operating agency and contractor, contractor and subcontractor(s), and subcontractor(s) and lower tiered subcontractor(s). Contractor shall furnish all supervision, technical personnel, labor, materials, machinery, tools, equipment, and services, including utility and transportation services, and perform and complete all work required for the construction of the project entitled.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents