Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Frontage Road Improvement Project
Infrastructure
Bidding
$3,000,000 est. value
Moville, IA 51039

Frontage Road Improvement Project
Infrastructure
Bidding
$3,000,000 est. value
Moville, IA 51039

Andrew Avenue Paving and Utilities Improvement
Infrastructure
Results
$1,600,000 est. value
Sergeant Bluff, Sioux City, IA 51054

Annual Sidewalk Ramp FY 2019-2020
Infrastructure
Results
$210,225 est. value
Sioux City, IA

HMA Resurfacing with Milling - U.S. 20
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Moville, IA 51039

Siouxland Expo Center Parking Lot Expansion
Infrastructure
Results
$668,615 est. value
Sioux City, IA 51101

PCC Pavement - Grade and New
Infrastructure
Bidding
$25,000 to $500,000 est. value
Sioux City, IA 51103

Transit Maintenance Garage Parking Lot Repair
Infrastructure
Results
$62,516 est. value
Sioux City, IA 51101

PCC Pavement - Grade and Replace
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Oto, IA

PCC Sidewalk/Trail
Infrastructure
Results
Sioux City, IA

PCC Pavement - Replace - K64
Infrastructure
Results
IA

HMA Resurfacing with Milling
Infrastructure
Results
IA

HMA Crack Filling - IOWA 3, IOWA 9, IOWA 10, IOWA 12, IOWA 60, IOWA 182, U.S. 75 BUSINESS
Infrastructure
Results
IA

HMA Paved Shoulder - New
Infrastructure
Results
IA

Reported 05/27/2022 12:00 AM
Project Title

Moville 2nd Street Overlay

Physical Address View project details and contacts
City, State (County) Moville, IA 51039   (Woodbury County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the 2nd Street Overlay includes approximately 465 Tons of HMA Overlay, PCC driveway and sidewalk replacement as needed, taper runout milling, and other associated work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents