Similar Projects
Bike Lane Construction Project
Bidding
Less than $500,000 est. value
Lubec, ME 04652

2020 Infrastructure Improvements
Bidding
Calais, ME

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Airfield Access Road Repair
Results
$25,000 to $100,000 est. value
Bangor, ME 04401

Paving Bid 2018
Results
Hampden, ME

Main Street Resurfacing Project
Bidding
Bangor, ME

Repair B541 Access Road
Post-Bid
$100,000 to $250,000 est. value
Bangor, ME 04401

Highway Safety and Spot Improvements/ Located at the Intersection of Coldbrook, Odlin, and Emerson Mill Roads
Results
Hermon, ME

Repair Marran Street Pavements
Post-Bid
$250,000 to $500,000 est. value
Bangor, ME 04401

(LCP) Light Capital Paving and Profile Milling
Results
$2,600,000 est. value

Katahdin Valley Health Center Parking Lot
New Construction, Demolition
Post-Bid
Patten, ME 04765

(LCP) Light Capital Paving
Results
Less than $1,400,000 est. value

Paving
Post-Bid
Milford, ME

(LCP) Light Capital Paving
Results
Less than $840,000 est. value

Last Updated 03/28/2019 09:38 AM
Project Title

Cyclical Pavement Resurfacing and Safety

Physical Address View project details and contacts
City, State (County) Lee, Springfield, Topsfield, ME (Penobscot, Washington Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $740,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Cyclical Pavement Resurfacing and Safety Improvements and other incidental work.Location: In Washington County, State Project 23999.00 is located in Topsfield on Route 6 beginning 5.17 miles West of the intersection of US Route 1 and Route 6, extending East 5.17 miles along Route 6 back to US Route I. In Penobscot County, State Project 24017.00 is located in Lee on Route 6 beginning 0.10 miles east of Route 168 and extending East 8.71 miles ending in Topsfield.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents