Similar Projects
River Trunk Realignment Shackelford Pump Station
Infrastructure
Bidding
$8,000,670 est. value
Modesto, CA

Backflow Testing and Emergency Repairs
Infrastructure
Bidding
Modesto, CA 95354

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

SDIA - Airport Administration Building - Underground Utilities
Infrastructure
Bidding
San Diego, CA 92108

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Avenues Three and One Sewer and Water Main Replacement
Infrastructure
Bidding
San Bruno, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Gladys Drive and Vicinity Main Replacement
Infrastructure
Bidding
$5,150,000 est. value
Pleasant Hill, CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Treated Water Booster Pumps
Alteration
Results
CA

Reported 12/16/2021 12:00 AM
Project Title

Construction of Van Ness Water Wells Transmission Main

Physical Address View project details and contacts
City, State (County) Torrance, CA 90503   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $12,000,000 to $13,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Major components include the following: Groundwater Wells: The existing wells located at the Border Avenue Facility were taken out of service due to poor water quality. Three (3) new groundwater wells and appurtenances will be drilled north of the 405 Freeway, in the vicinity of 185th Street and Van Ness Avenue. Well No. 12 will be located behind Hamilton Adult School, Well No. 13 will be located at La Carretera Park, and Well No. 14 will be located at Descanso Park. Water Transmission Main: A new 3-mile long, 24-inch diameter water transmission line will be constructed from the new well locations in the area of 185th Street and Van Ness Avenue and head south on Van Ness Avenue to the existing Border Avenue Booster Pump Station and Reservoir. The existing Border Avenue Reservoir and Booster Pump Station, located on Border Avenue between 222nd Street and Plaza Del Amo, will be modified as needed in order that the water from the new wells can be treated, stored, and distributed to the east and central areas of the City.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents