Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Glen Cove Lift Station Rehabilitation
Renovation
Bidding
$1,600,000 est. value
League City, TX

Oaks of Clear Creek Drainage Improvements Phase 2 Detention Pond
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
League City, TX

Willow Bayou/Avenue L Drainage
Post-Bid
$1,700,000 est. value
Galveston, TX 77551

Galveston Seawall Rip Rap Deficiencies West of 61st Street
Post-Bid
$2,200,000 est. value
Galveston, TX

Falco Booster Station
Results
$750,000 est. value
Dickinson, TX 77539

Detention/Amenity Basin and Rough Grading to Serve the Vida Costera Subdivision
Results
Texas City, TX 77510

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Construction of Water, Sanitary, and Drainage Facilities in Lago Mar Townhomes
Infrastructure
Bidding
$70,000 est. value
Texas City, TX

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 9
Post-Bid
League City, TX

Westside Water Well and Booster Pump Station - Calder Road
Results
League City, TX 77573

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 10
Infrastructure
Bidding
$530,000 est. value
Texas City, TX

Centennial Park and Lakes of Falcon Ridge Wall Project
Post-Bid
Friendswood, TX

Streets and Drainage
Results
Less than $1,200,000 est. value
Santa Fe, TX

Water, Sewer and Drainage Improvements for Ambrose Section One
Post-Bid
Houston, TX

Last Updated 05/28/2022 03:16 AM
Project Title

Bay Ridge Flood Reduction Phase 2

Physical Address View project details and contacts
City, State (County) League City, TX   (Galveston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of deepening the existing detention pond, installation of 42,000 GPM storm water pump station, and a natural gas generator within the Bay Ridge Subdivision.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents