Similar Projects
Center Street Duplex Apartments
New Construction
Conception
Chino Valley, AZ 86323

Ferguson Enterprises Warehouse - Phase I and II
New Construction - 544,320 SF
Conception
Chandler, AZ 85286

Ronstandt Transit Center Redevelopment
New Construction
Design
$60,000,000 est. value
Tucson, AZ 85701

St. Ambrose Apartments
New Construction - 129,910 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Phoenix, AZ 85006

Watermark at Lake Pleasant Parkway
New Construction
Post-Bid
$10,000,000 CJ est. value
Peoria, AZ 85383

Scotland Court Industrial - Phase I
New Construction - 130,272 SF
Post-Bid
$3,368,752 est. value
Queen Creek, AZ 85142

Z--Glen Canyon Warehouse Renovation
Renovation - 16,000 SF
Results
$5,000,000 to $10,000,000 est. value
Page, AZ

Call For Interest - Proposals of Acquisition/Rehabilitation or New Construction of Affordable Rental Housing
Results
Less than $1,000,000 est. value
Phoenix, AZ

Daybreak Apartments - Tempe, AZ
New Construction - 58,445 SF
Construction
$3,500,000 est. value
Tempe, AZ 85281

West 80 Industrial - Shell
New Construction - 382,386 SF
Construction
$15,160,000 est. value
Phoenix, AZ 85043

Cerro Vista
New Construction
Pending Verification
Avondale, AZ 85018

Oasis at the Wells
New Construction - 663,086 SF
Pending Verification
$10,000,000 CJ est. value
Maricopa, AZ

Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

Brook Apartments
New Construction - 225,600 SF
Design
$10,000,000 CJ est. value
Chino Valley, AZ 86323

PV303 - Building 2
New Construction - 643,798 SF
Post-Bid
$10,000,000 CJ est. value
Goodyear, AZ 85338

Last Updated 11/09/2020 03:01 PM
Project Title

Esperanza Condos

Physical Address View project details and contacts
City, State (County) Lake Havasu City, AZ   (Mohave County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Swimming Pool(s), Warehouse/Storage
Contracting Method
Project Status Construction Commenced September 2019, Construction Complete as of third quarter 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, New Construction 18 Unit(s), Swimming Pool(s), Warehouse/Storage, 18 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents