Similar Projects
Payne Branch Basin Sewer Improvements
Infrastructure
Bidding
Greenville, SC

Wastewater Flow Metering Services
Term Contract
Post-Bid
Greenville, SC 29602

2021 Annual Maintenance Contract
Post-Bid
Greenville, SC

Basin Phase 1 CIPP Lining Project
Results
Less than $893,358 est. value
Greenville, SC

RMF Sanitary Sewer Extension
Results
Greenville, SC

Highway 25 Business Park Phase II
Infrastructure
Post-Bid
Greenville, SC

2020 Sanitary Sewer Rehabilitation Project
Results
$750,000 est. value
Fountain Inn, SC 29644

Blossom Branch Sewer Improvements Division I
Results
Greenville, SC 29607

Simpsonville B Pump Station Elimination
Results
Greenville, SC

Mauldin Basin Phase 2 Sewer Rehabilitation Project
Results
Greenville, SC

Pelham WRRF Basin Find-and-Fix Cipp Project - Phase 1
Results
Greenville, SC

Peppertree Trunk Sewer
Results
Greenville, SC

Woodside Mill Village Sewer Relocation
Results
Greenville, SC

Pine Forest Pump Station Elimination
Infrastructure
Results
Greenville, SC

Phillips Mccall Road Gravity Sewer
Infrastructure
Results
SC

Last Updated 11/19/2021 11:41 AM
Project Title

Basin 5 Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Mauldin, SC   (Greenville County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes cleaning and televising approximately 16,500 feet of 8” sanitary sewer; performing necessary point repairs to the existing sewers to facilitate installation of cured-in-place pipe lining (CIPP); lining approximately 16,500 feet of 8” sanitary sewers with CIPP and performing all associated work including removing protruding service laterals, re-connecting active service laterals to the lining, and performing product tests; rehabilitating service laterals where deemed necessary; performing miscellaneous manhole rehabilitation work such as replacing frames and covers and rebuilding existing benches and inverts; and performing required restoration work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents