Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

South Street Lift Station Upgrade
Renovation
Bidding
Poynette, WI 53955

Hospital Utility Extension Lift Station 16
Addition
Bidding
Cumberland, WI

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Lift Stations 1 & 10 Generator Buildings
Renovation
Post-Bid
$345,000 est. value
Pewaukee, WI 53072

Sanitary Sewer Pump Station - Frame Park Restroom
Results
Waukesha, WI 53188

Mannville Lift Station Replacement
Renovation
Results
Marshfield, WI 54449

SMU Lift Station Replacement
Post-Bid
New Franken, WI

Lift Station No. 3 Improvements
New Construction
Results
$625,000 est. value
Wind Lake, WI 53185

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

Landfill Lift Station Modifications
Renovation
Post-Bid
Appleton, WI 54911

Museum Place Storm Lift Station
Results
Green Bay, WI

Trotzer Lane and Ryan Street Lift Stations
New Construction
Post-Bid
Weston, WI 54476

Greenville STH 76 - Force Main and Lift Station No.1 and No.2 Improvements, Contract I-20
Results
Greenville, WI 54942

Last Updated 03/23/2022 05:08 PM
Project Title

Big Buck Lift Station Improvements Phase I

Physical Address View project details and contacts
City, State (County) Kenosha, WI 53142   (Kenosha County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General construction of wastewater lift station facilities including sitework, yard piping, structural, architectural, process piping and equipment, painting, plumbing, heating, ventilation, air conditioning, electrical and instrumentation and control. Providing sewers and manholes. Providing dewatering services as required. Obtaining all permits for construction of Work not obtained by Engineer or Owner. Execute Right-of-Entry Agreement with Union Pacific Railroad and provide flagging as required. Removing all debris and excess materials from Project Site generated by construction Work. Restoring existing service connections. Restoring areas disturbed by construction. Providing electric and gas utilities. Providing concrete structures. Providing hatches. Providing a gate, pump, piping and valves. Providing heating and ventilation equipment and ductwork. Providing a VFD. Providing controls.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents