Similar Projects
Drainage Cleaning on Various Sections of State Roads
Bidding
Less than $400,000 est. value

Operation Drainage System and Correct any Deficiencies within the Problem Areas as Part of the District Storm Water Management Systems
Bidding
Less than $500,000 est. value

Asphalt Paving, Resurfacing and Drainage
Term Contract
Post-Bid
FL

Beach Erosion Control and Hurricane Protection Project, Surfside Segment, Dade County, Florida
Post-Bid
$15,000,000 to $25,000,000 est. value
Surfside, FL

Hurricane Irma - Hobie Island and Virginia Key Repairs and Restoration
Results
Less than $2,700,000 est. value
FL

Drainage Improvements Project NW 2 Court to NW 5 Avenue from NW 103 Street to NW 111 Street
Results
Less than $706,849 est. value
FL

Drainage Improvements CRS North Phase I
Bidding
Less than $734,541 est. value
Miami, FL 33128

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

Drainage Improvements Project Multiple Sites
Results
Less than $496,615 est. value
FL

Drainage Improvements
Bidding
Less than $1,000,000 est. value

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

Canal Bank Stabilization Project
Results
Less than $127,051 est. value
Pinecrest, FL

Drainage Improvements Multiple Sites
Post-Bid
Less than $840,458 est. value
Miami, FL 33128

Greynolds Park - Bridges Culverts and Fresh Water Flow Restoration
Results
Less than $415,985 est. value
Miami, FL 33160

South Miami-Dade Salt Intrusion Barrier Project
Post-Bid
Less than $500,000 est. value
Miami, FL 33128

Reported 05/31/2019 12:00 AM
Project Title

Mount Sinai Medical Center, Continuing Authorities Program (CAP) Section 14, Project, Miami-Dade County, Florida

Physical Address View project details and contacts
City, State (County) Miami, FL 33101   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Project work consists of installation of 3,070 linear feet of sheetpile (25 feet long PZC-13 steel sheetpile) driven to a depth of 16 feet in the 3,200 feet long footprint of the existing seawall. Use of a vibration or impact hammer to drive the sheetpile no more than 3 feet waterward of the existing seawall with a concrete cap elevation of 4.0 feet, North American Vertical Datum of 1988 (NAVD88). The three foot offset is necessary for workers to reconnect any drainage system or utilities between the new and existing seawall. The three feet offset will be filled with stone. A 300 feet long T-wall will tie into the sheetpile and continue landward to the 3.5-foot contour to prevent flanking of the seawall. A 1.5-foot concrete lift added to the 130-foot section of existing seawall constructed in 1990 to reach an overall crest elevation of 4.0 feet NAVD88. Project work also includes endangered species observers, turbidity monitoring and stand by time.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents