Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

RFP Engineering - 2022 Design and Construction Engineering Services - West Maple Road
Infrastructure
Bidding
$1,000,000 CJ est. value
Wixom, MI 48393

RFQ Developer - Mixed-Use Development Partner
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Rochester, MI 48307

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

RFP - Building Department Services
Term Contract
Bidding
Troy, MI 48098

Planning Services
Post-Bid
Lake Orion, MI

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFP - City Engineer for City of Keego Harbor
Term Contract
Bidding
Keego Harbor, MI 48320

As-Needed Inspection and Testing for Multiple Signal Locations
Infrastructure
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

RFQ - On-Call Building Consultant Services
Term Contract
Bidding
Auburn Hills, MI 48326

Last Updated 12/22/2022 10:09 AM
Project Title

7 Lakes SP - ARPA Electrical, Paving and Shelter Improvements

Physical Address View project details and contacts
City, State (County) Holly, MI 48442   (Oakland County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 22, 2022, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The DNR seeks to retain the services of a qualified engineer to develop plans for the following needs at Seven Lakes State Park: 1. A renovation/replacement of two shelters at Seven Lakes SP. The shelters are in poor condition and an engineer is needed to provide design services to either upgrade the existing shelters or provide design for new shelters. An evaluation and recommendation is needed by a design professional. 2. Targeted paving improvements will be developed throughout the park. The roads throughout the park are deteriorating, consisting of numerous potholes and cracking. Engineering plans are needed to address the current condition of the pavement. 3. Campground upgrades for the electrical system are needed. The campground electrical system is outdated and in need of upgrades to accommodate larger RV's, which represents a large portion of current users. Design Review Meetings to be held at 50% and 90% reviews for Phase 400 and Phase 500 and as the PSC deems necessary. Microsoft Teams meetings are acceptable. The PSC shall be responsible for running construction progress meetings twice a month for the duration of the project, including a Pre-Construction meeting. Please provide a probable cost estimate for the anticipated work Two weeks review time is anticipated for each submission No multiple substantial completions are anticipated at this time Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. ACCEPTING RFP QUESTIONS UNTIL: September 29, 2022 at 2:00 pm Please do not submit questions via VSS. ALL questions should be emailed to Sheryl Ananich at ananichs@michigan.gov This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply The method of Contractor Selection has not been Determined at this time

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents