Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

69th Street Wastewater Treatment Plant - R-000509 - City of Houston
Renovation
Conception
$32,740,000 est. value
Houston, TX 77011

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

HPW - Flow Diversion (36-inch) from Imperial Valley WWTP to Northgate Regional Lift Station, North Corridor Consolidation Package 3 - 60% Submittal
Infrastructure
Design
Houston, TX 77002

Facilities Improvements to Serve Faulkey Gully Municipal Utility District Water Plant No. 1, Water Plant No. 2, Water Well No. 3 and Lift Station No. 1
Renovation
Bidding
$275,677 CJ est. value
Tomball, TX 77375

1.20 MGD Wastewater Treatment Plant Phase III Improvements
Renovation, Infrastructure
Bidding
$800,000 CJ est. value
Houston, TX 77002

Modular Building Relocation
Renovation - 3,408 SF
Post-Bid
Houston, TX 77082

Wastewater Treatment Plant Upgrades and Improvements 2017
Renovation
Post-Bid
$3,566,000 est. value
Houston, TX

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

Operation and Maintenance Services for the Greater Northeast Houston Service Area (Gnehsa) Water and Wastewater Utilities and Facilities
Term Contract
Results
Houston, TX

New 0.2875 MGD ADF Wastewater Treatment Plant
New Construction
Construction
$2,553,943 est. value
Houston, TX

Wastewater Plant Phase One
New Construction
Construction
TX

BAWA1901 - BAWA Filter Scour Improvements - City of Baytown
Renovation
Pending Verification
$3,300,000 CJ est. value
Baytown, TX 77520

Vince Bayou Wastewater Treatment Plant Wet Weather Facility - WW084 - City of Pasadena
New Construction, Infrastructure
Conception
$3,500,000 CJ est. value
Pasadena, TX 77506

HPW - Tidwell Timbers Wastewater Treatment Plant Abandonment and Flow Diversion to FWSD #23 Wastewater Treatment Plant
Infrastructure
Design
$100,000 CJ est. value
Houston, TX 77002

Last Updated 01/12/2023 12:05 PM
Project Title

Vince Bayou Wastewater Treatment Plant UV Disinfection

Physical Address View project details and contacts
City, State (County) Pasadena, TX 77506   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope consists of Vince Bayou Wastewater Facility Bar Screen and Ultraviolet Disinfection (UV) upgrades. No bids may be withdrawn after the scheduled closing time for receiving of bids, for at least thirty (30) days. The "OWNER" reserves the right to reject any and/or all bids and to waive formalities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents