Similar Projects
Route 23 Corridor Safety Improvments Chester Co
Infrastructure
Conception
$1,907,730 CJ est. value
Elverson, PA 19520

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Construct Terminal Building Addition
Addition, Demolition, Infrastructure
Design
$1,400,000 CJ est. value
Toughkenamon, PA 19374

Ewing Road /White Clay Creek
Demolition, New Construction, Infrastructure
Design
$1,581,000 CJ est. value
Cochranville, PA 19330

Marsh Creek Watershed Protection Project
Infrastructure
Bidding
$639,696 CJ est. value
West Whiteland Township, PA 19341

US 322 West Chester Bypass Safety Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Downingtown, PA 19335

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Traffic / Street Signs & Posts and Water Piping & Fittings - Materials Only
Infrastructure
Post-Bid
Pottstown, PA 19464

Utilities Grant - 2021 Water Line Project
Results
Honey Brook, PA 19344

Everhart Park Playground
New Construction, Infrastructure
Results
West Chester, PA 19382

Rail Yard Reconstruction and Bridge Rehabilitation - Coatesville
New Construction, Renovation
Construction
Coatesville, PA

Railroad Infrastructure Rehabilitation - Coatesville
Renovation
Construction
Coatesville, PA

Tabas Lane Mixed-Use / West Whiteland Township
New Construction, Infrastructure - 13,297 SF
Pending Verification
$3,000,000 CJ est. value
Exton, PA 19341

DR Horton Honey Brook Residential / Arbor’s Edge
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Honey Brook, PA 19344

PA 41 and SR 841 Improvements
Infrastructure
Conception
$5,520,000 CJ est. value
West Grove, PA 19390

Last Updated 11/17/2022 03:32 AM
Project Title

Pocopson Elementary School Pump Station Project

Physical Address View project details and contacts
City, State (County) West Chester, PA 19382   (Chester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $298,800 [brand] Estimate
Plans Available from Civil Engineer - 09/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of a pump station and approximate 760 LF of force main behind the Pocopson Elementary School. The bid must include all costs incidental to the work of the Project. Products shall be prequalified as equals for use on this project as is described by the Information to Bidders. Bidder shall meet the standards set forth in the Instructions to Bidders. Bids may not be modified, withdrawn or canceled within a period of 60 days following the date for receipt of bids without the prior written consent of Unionville Chadds Ford School District. UCFSD reserves the right to waive any informalities, irregularities, defects, errors or omissions in any or all bids and to reject any or all bids. Notwithstanding any other provision of the Bidding Documents, UCFSD will have complete discretion to award a Contract (or not to award a Contract) to any bidder based on any criteria UCFSD deems relevant.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents