Similar Projects
HVAC Replacement - Physical Plant Offices
Bidding
Arnold, MD

Heating and Ac Repairs at Patuxent Institution
Bidding
Less than $100,000 est. value
Jessup, MD 20794

Oil Heater Replacement at Glen Burnie Maintenance Shop
Post-Bid
Less than $50,000 est. value
Glen Burnie, MD 21061

Dust Collector Rental
Post-Bid
Curtis Bay, MD 21226

Construction - Install 1 - Tone Split AC Unit
Results
Fort Meade, MD

On-Call Maintenance Services for Heating Ventilation and Air Conditioning (HVAC)
Results
$100,000 to $500,000 est. value
Hanover, MD 21076

VPU HVAC Replacement at Diggs Johnson Building 162
Alteration
Bidding
Baltimore, MD 21223

Air Handler Replacement - Sculpture Studio
Post-Bid
$70,000 to $100,000 est. value
Arnold, MD 21012

Main Cable and Anchorage Dehumidification System Maintenance
Term Contract
Results
$1,000,001 to $2,500,001 est. value
Annapolis, MD 21409

Energy Management Maintenance and Control System Programming
Term Contract
Post-Bid
Annapolis, MD 21401

HVAC Replacement at North County High School
Results
Glen Burnie, MD 21061

New HVAC Controls at the Administration Building of the Maryland Correctional Pre-Release System
Post-Bid
$100,000 to $500,000 est. value
Jessup, MD 20794

Installation of Forty (40) Steam Heat Units - Patuxent Institution
Results
Jessup, MD 20794

HVAC Boiler Maintenance and Water Treatment Services
Post-Bid
Less than $50,000 est. value
Baltimore, MD 21234

J--HVAC Service Maintenance
Results
Laurel, MD

Last Updated 05/06/2021 09:09 AM
Project Title

HVAC Replacement at Johnston Square Elementary School 016

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21202   (Anne Arundel County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: 1. Installation of packaged air conditioning units in select classroom on the ground, first and second floors of Johnston Elementary School. 2. Provide electrical infrastructure in support of new mechanical equipment.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 08 - Openings, Metal Frames, Hollow Metal Frames, Door Hardware.
Division 09 - Finishes, Painting, Interior Painting.
Division 10 - Specialties.
Division 12 - Furnishings.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 31 - Earthwork.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents