Similar Projects
Fire Alarm System Installation
Renovation - 20,013 SF
Design
$200,000 CJ est. value
Dallas, TX 75390

Cellular Distributed Antenna System (DAS)
Term Contract
Sub-Bidding
Dallas, TX 75201

Polymers
Term Contract
Sub-Bidding
Dallas, TX 75201

Provide Install and Service IP Camera Equipment
Term Contract
Post-Bid
Mesquite, TX

Automated Access Control System Installation and Maintenance Services
Term Contract
Post-Bid
Dallas, TX

Physical Security/Access Control Systems (PS/AC) Multiple Award Construction Contract (MACC)
Results
Less than $99,000,000 est. value

RFI - Home Intrusion Detection Systems
Results

Central Station Alarm Monitoring (CSAM)
Post-Bid

Telecommunications Infrastructure Testing Services - Worldwide
Results

N--DAS maintenance
Post-Bid

Residential Intrusion Detection Alarm System
Results

Request For Information - Command Post Console Installation
Post-Bid

West Oak Cliff (WOC) Microduct Installation
Results
Dallas, TX

UNT Campus Classroom Electronic Locking System
Alteration
Post-Bid
Dallas, Denton, Fort Worth, TX 75241

Cabling Service
Results
$16,446 est. value
Grand Prairie, TX

Last Updated 08/17/2022 12:34 PM
Project Title

USPS North Texas P&DC Security Upgrades

Physical Address View project details and contacts
City, State (County) Coppell, TX 75099   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Postal Service plans to issue a Fixed Price Contract to complete a Security Upgrade project located at the North Texas P&DC, 951 W BETHEL RD, COPPELL, TX 75099-5000. All work will be done in accordance with USPS approved specifications and drawings. The estimated cost range of the project is $1,200,000.00 to $1,600,000.00 with construction completion within 270 calendar days from receipt of notice to proceed. Contractors must submit a Qualification/Evaluation Package with their price proposal. Only the most qualified contractors will be considered. To be considered, a company must meet the following minimum requirements: (1) LICENSE(S): Suppliers must submit a copy of any State or Local Government Agency's General Contractors license. If a project resides in a State that does not require a General Contractors License, submit a copy of your local government agency license and a signed statement certifying that only licensed subcontractors will be utilized on USPS projects. (2) Contractors must have been in the construction business for a minimum of five consecutive years as of the date of this solicitation. There is no requirement that eligible contracting firms remained the identical entity for the five-year period, although legal entity changes (such as from a partnership to a corporation) that occurred during this five-year period should be clearly explained, and if key personnel were retained, this should also be clearly explained. (3) Contractor must be capable of obtaining performance and payment bonds for 100% of the contract price. (4) Contractors must provide evidence of their current EMR rating on insurance company letterhead. If the EMR rating is greater than 1.0, the contractor must provide a written explanation from its insurance carrier along with evidence of your previous two years EMR ratings on insurance letterhead. An EMR more than 1.5 may be grounds for eliminating a firm from further consideration by the evaluation team. (5) Company must submit information for three comparable projects that have been completed within the past five years. Comparable projects are defined as projects with similar scopes of work and costs of $750,000.00 or more. The Qualification / Evaluation Package will be evaluated in accordance with the criteria stated. The price proposals for only the most highly qualified contractors will be considered. The Postal Service is more concerned with obtaining superior technical and management features than with making an award at the lowest overall price. However, the Postal Service will not necessarily make an award at a significantly higher overall price to achieve slightly superior technical or management features. The evaluation factors outlined in Section 2-26.2 of the Supplying Principles and Practices, listed in descending order of importance, will be used in the evaluation of proposals. PRE-PROPOSAL MEETING: August 23, at 10:00 AM Local Time (CST) 951 W BETHEL RD, COPPELL, TX 75099-5000 QUESTIONS SHOULD BE DIRECTED TO: Kimberly Kinney, Kimberly.S.Kinney@usps.gov, or Thomas Pio, Thomas M. Pio@usps.gov. Deadline for questions is 12:00 Noon Eastern Time on Sept 1st , 2022. The OFFEROR'S PROPOSAL RETURN PACKAGE: should be submitted via the COUPA application by the proposal due date & time. It is the contractor's responsibility to seek confirmation of the receipt of their proposals. For help with the eSourcing program, please email the eSourcing COUPA helpdesk at esourcing@usps.gov. If not currently registered in COUPA, utilize the following URL to start the process: https://about.usps.com/suppliers/becoming/registration.htm . Once registration has been completed, notify the contacts listed above via email so that we can then send your company a COUPA invitation to the project allowing access to view the solicitation documents. There will be no public opening of offers. All proposal information received is CONFIDENTIAL until award of a contract. Upon award, the name of the successful offeror and the amount of the contract will be released as public information. The names of offerors and the amount of their offers will not be released as public information. This information is exempt from disclosure under the Freedom of Information Act, Exception 4. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Access Doors and Panels, Entrances and Storefronts.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Postal Specialties, Central Mail Delivery Boxes, Mail Collection Boxes, Receiving Boxes, Mail Boxes, Parcel Lockers, Package Depositories, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Postal, Packaging, and Shipping Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Container Processing and Packaging, Container Packing Equipment, Shipping Packaging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents