Similar Projects
Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

Louisburg MS Early Parking Lot / Rockville Parking Lot
Post-Bid
Louisburg, KS

Moonlight Sidewalk
Post-Bid
Gardner, KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

2021 Asphalt Overlay Program
Results
KS

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Curb and Gutter Replacement
Infrastructure
Post-Bid
Topeka, KS 66606

Mill and Overlay
Results
$831,421 est. value
KS

Curb and Gutter Replacement
Infrastructure
Post-Bid
Topeka, KS

Chip and Seal
Results
$535,242 est. value
KS

Last Updated 08/30/2022 06:06 PM
Project Title

Resealing and Striping of the Asphalt Parking Lot and Driveways on the Ottawa Campus

Physical Address View project details and contacts
City, State (County) Ottawa, KS 66067   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $440,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor is responsible for ascertaining the extent of work to be completed and bid accordingly. Failure to inspect the jobsite will not relieve the contractor of the obligation to complete the work as specified by NCCC. We anticipate that a recommendation on the bids will be made to the NCCC Board of Trustees at the board meeting at 5:30 p.m. on September 8th, 2022 in Room 209 of the Student Union on the Chanute campus.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents