Similar Projects
Tappan Street Auxiliary Building - Tappan Street Auxiliary Building Removal
Renovation
Bidding
Ann Arbor, MI

Medical Sciences Research Building III - ERU-1 and ERU-2 Modifications
Renovation
Bidding
Ann Arbor, MI

Frankel Samuel and Jean Cardiovascular Center Building Number 1005109 CVC EP Lab 6 Bidpack 01 - Construction
Post-Bid
Birmingham, MI

Construction Management Service - Rock Cafe and Miller Hall Renovations
Post-Bid
Big Rapids, MI

Professional Pre-Construction and Construction Management Service - West Building Replacement
Results
Big Rapids, MI

Southwestern Michigan College Niles Area Campus - Chemistry Lab Renovations
Renovation
Results
Niles, MI

South University Facade
Renovation
Construction
Ann Arbor, MI 48104

Horticulture Education Center Construction Project
Construction
Detroit, MI 48200

FSU Center for Athletic Performance- Bid Package 02
New Construction, Renovation - 40,000 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Big Rapids, MI

Mott Childrens Von Voigtlander Womens Hospitals - Sophies Place - C and W Level 3
Post-Bid
Ann Arbor, MI

ATC Sice Piazza Construction Management Services
Results
Grand Rapids, MI

Baker College Business School
New Construction - 86,000 SF
Construction
$51,000,000 est. value
Royal Oak, MI 48068

Flint William S White Building - Classroom Renovation
Renovation
Post-Bid
Ann Arbor, MI 48109

Classroom, Lecture Halls, Labs & Toilet Room Alterations at Several Buildings at MCCC
Renovation
Results
Monroe, MI 48161

Strosacker Learning Commons - Phase 2
New Construction - 25,223 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Midland, MI 48640

Reported 10/07/2021 12:00 AM
Project Title

William A Demmer Engineering Center

Physical Address View project details and contacts
City, State (County) East Lansing, MI   (Ingham County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Design-Build. Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construct approximately 10,000 GSF facility to provide for the Engineering Center to facilitate participation in valuable co-curricular activities, such as student competition teams including Baja, Formula 1, and Solar car teams as well as the concrete canoe and steel bridge teams. The building will be similar in size and shape to the existing MSU Performing Arts Teaching Lab located nearby, which will be used as the basis of design. The building can be constructed as an engineered post frame or pre-engineered metal building. The major areas of the facility are further described in the general scope of work, bridging documents and basis of design drawings issued with this RFP

Details

College/University, 10,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents