Similar Projects
New Industrial Park Streets
Post-Bid
Dieterich, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

7.2 Miles of Milling and Resurfacing on Montrose Blacktop From Il 121 to the Effingham County Line Near Montrose
Results
Montrose, IL

7.9 Miles of Milling and Resurfacing
Results
IL

Bituminous Material
Post-Bid
Effingham, IL

2 Miles of Crack and Joint Sealing on I-57/70 from the Little Wabash River to Us 40 and 2.75 Miles on i-57/70 from 4th Street Overpass to the North Tri- Level Including Exit and Entrance Ramps
Results
IL

Seal Coat
Infrastructure
Post-Bid
Effingham, IL

1.56 Miles of Partial Depth Resurfacing at Various Locations on US 40, IL 32 and IL 33
Results

Four Seasons Reconstruction
Results
Less than $142,221 est. value
Effingham, IL

2021 Temple Avenue Resurfacing
Results
Less than $430,777 est. value
Effingham, IL 62401

2021 Street Resurfacing Program Phase 1
Results
Less than $559,854 est. value
Effingham, IL

2021 Pavement Preservation
Results
Less than $461,324 est. value
Effingham, IL

2021 Crack and Joint Sealing Program
Results
Less than $30,000 est. value
Effingham, IL

2021 Hot and Cold Mix Program
Results
Less than $53,500 est. value
Effingham, IL

2021 Oil and Chip Program
Results
Less than $102,537 est. value
Effingham, IL

Last Updated 06/24/2022 01:02 AM
Project Title

2022 Hot and Cold Mix Program

Physical Address View project details and contacts
City, State (County) Effingham, IL   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work is officially known as 2022 Hot & Cold Mix Program for the City of Effingham, Effingham, Illinois. The project shall consist of furnishing materials required in the maintenance of streets and alleys in the City of Effingham. Failure on the part of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. Proposals must be submitted to the City Engineering Office, City of Effingham on a form furnished by the Municipality, which may be obtained at the office of the City Engineer, City of Effingham and shall be enclosed in a separate and sealed envelope endorsed 2022 Hot & Cold Mix Program. It is anticipated that a Notice of Award of a contract will be issued within 30-to-60 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents