Similar Projects
Replace Superstructure
New Construction, Infrastructure
Conception
$3,646,000 est. value
Lynnville, IN 47619

Wastewater Treatment Plant Expansion - River Ridge Development Authority
Infrastructure
Conception
$40,000,000 est. value
Jeffersonville, IN 47130

Intersection Improvement With Added Turn Lanes
Infrastructure
Design
$266,217 CJ est. value
Greenfield, IN 46140

Other Intersection Improvement
Infrastructure
Design
$585,000 CJ est. value
Goshen, IN 46528

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$977,498 CJ est. value
Warren, IN 46792

Bridge Deck Overlay - SR 54
Infrastructure
Bidding
$500,000 CJ est. value
Bloomfield, IN 47424

Wellness Center - Bid Packets
New Construction, Infrastructure
Sub-Bidding
Greencastle, IN 46135

Site Improvements and Related Work at Various Locations
Post-Bid
IN

Advanced Metering Infrastructure System
Infrastructure
Post-Bid
Tell City, IN

Reverse Osmosis System Upgrade
Results
$25,000 to $100,000 est. value
Fort Wayne, IN

Fairfield JR/SR High School 2021 Site Improvements
Results
Goshen, IN 46526

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

Simon Moon Park - City of Westfield
Renovation, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Westfield, IN 46074

HMA Overlay, Preventive Maintenance
Infrastructure
Conception
$2,192,756 CJ est. value
Bedford, IN 47421

Southpark Industrial
New Construction, Infrastructure - 42,000 SF
Design
$4,500,000 CJ est. value
Westfield, IN 46074

Last Updated 09/19/2022 10:31 AM
Project Title

Kingman Wastewater Facilities Improvements Division A and Division B

Physical Address View project details and contacts
City, State (County) Kingman, IN 47952   (Fountain County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $6,143,294 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

*September 19, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Town of Kingman is requesting Bids for the construction of the following Wastewater Improvements Project: Division A and Division B. Division A - Wastewater Facilities Improvements: Scope of work generally includes the following: - New influent screening structure and building, - Replacement of aeration grid piping and diffusers in existing aeration tank and digester tank, - Installation of a new rectangular secondary clarifier and building, - Installation of aluminum flow splitter box in existing aeration tank to direct flow to the existing secondary and new secondary clarifiers, - Replace pumps in existing lift station and install new pumps and telescopic clarifier draw-off valves for RAS/WAS pumping, - Installation of a valve vault for the RAS/WAS lift station, - Installation of a 70' diameter x 18.5' high concrete flow equalization tank and electric actuated plug valve for controlling the flow released from the tank, - Installation of a set of aeration blowers for existing aeration tank, digester tank, and a set for the proposed flow equalization tank, - Installation of an ultraviolet disinfection system, - Modifications to the existing chlorine contact tank, - Modifications to the existing Laboratory/Control building, - Preparation and painting of the existing Secondary Clarifier building and Laboratory/Control Building, - Install polymer feed and other equipment for sludge dewatering including sludge pump and building, - Modifications to Second Street and State Street Lift Stations, including new submersible type and abandoning existing wet/well - dry pit systems, - Furnish and install standby generators at wastewater treatment plant, Second Street Lift Station, and State Street Lift Station, - Electrical modifications and additions, - Valve replacements and new piping and valve installations, - Miscellaneous site work as shown on the plans, - Restoration and miscellaneous work to complete the project. Division B - Wastewater Facilities Improvements: Scope of work generally includes the following: - New influent screening structure and building, - Replacement of aeration grid piping and diffusers in existing aeration tank and digester tank, and installation of aeration piping and diffusers in existing secondary clarifier, - Replace pumps, piping and valves in existing lift station, - Installation of an AeroMod treatment system, including aeration blowers, - Installation of an ultraviolet disinfection system, - Modifications to the existing chlorine contact tank, - Modifications to the existing Laboratory/Control building, - Preparation and painting of the existing Secondary Clarifier Building and Laboratory/Control Building, - Install polymer feed and other equipment for sludge dewatering including sludge pump and building, - Modifications to Second Street and State Street Lift Stations, including new submersible type and abandoning existing wet/well - dry pit systems, - Furnish and install standby generators at wastewater treatment plant, Second Street Lift Station, and State Street Lift Station, - Electrical modifications and additions, - Valve replacements and new piping and valve installations, - Miscellaneous site work as shown on the plans, - Restoration and miscellaneous work to complete the project. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time he executes his contract. The bond will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. A conditional or qualified Bid will not be accepted. The Bidders attention is also called to the "Minority/Women Business Participation" requirements contained in the Project Specifications. The State of Indiana, Department of Commerce, has adopted a State goal of 10% participation for minority and female owned businesses for construction related or purchase related contracts for the work. Bid Results: Schomburg & Schomburg Construction Inc. Division A- $2952650 Division B- $3190644

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents