Similar Projects
Island Grove Poudre River Trailhead
Results
Greeley, CO

SRTS Thunder Valley Trail
Results
Less than $1,093,992 est. value
Frederick, CO 80530

2020 Concrete Maintenance Services
Term Contract
Results
$150,000 to $200,000 est. value
Erie, CO 80516

Construction Manager for Milliken Path Improvements
Results
Milliken, CO 80543

Ash Street Improvements
Results
Hudson, CO 80642

Great Western Trail Improvements
Post-Bid
Windsor, CO 80550

Parking Lot Maintenance 2020
Post-Bid
Less than $100,000 est. value
Greeley, CO 80639

Kahil Reconstruction Project
Post-Bid
Fort Lupton, CO 80621

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

Clerk and Recorder Building Site Work
Results
Greeley, CO 80631

East Harmony Road and 1st Street Corridor Plans
Results
Severance, CO 80546

Centennial Trail Improvement
Post-Bid
Kersey, CO

2020 Bike Walk Maintenance Program
Results
Greeley, CO 80631

Little Thompson River Trail Project
Post-Bid
Johnstown, CO 80534

65th Avenue Road Widening Project
Results
Greeley, CO 80631

Reported 12/05/2020 12:00 AM
Project Title

WCR23/Great Western Trail Pedestrian Connection - Design and Consultation Service

Physical Address View project details and contacts
City, State (County) Severance, CO   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified consultant teams that include a licensed engineering firm as project lead (Consultant), a surveying consultant, and an environmental consultant specializing in natural/cultural resource evaluation to provide design-phase services for the Great Western Trail Pedestrian Connection, including: • Project Scoping • Site survey • Field Inspection Review • Environmental Reviews (as required) o Wetland Determination/Delineation o Section 404 Permit o Migratory Bird Survey o Historic Resource Inventory o Stormwater Management Plan and MS4 Evaluation o Noxious Weeds Assessment and Management Plan o Hazardous Waste Assessment o Threatened & Endangered Species Assessment o Non-historic 4(f) or NH 4(f) • Right-of-way/utility/railroad clearances • Final Office Review • Consultation with Construction Phase Team • Deliverables shall include Construction Plans, Specifications, Cost Estimates and Environmental Reports (as required). Note: Cost Estimates are not to be included with the Bid Proposal.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents