Similar Projects
Spring Hill Road MPI Paving Project
Post-Bid
Saco, ME 04072

2021 Hot Mix Asphalt
Term Contract
Post-Bid
Saco, ME

Kittery Point Bridge Wearing Surface Replacement
Results
Kittery, ME 03854

Pavement Rehabilitation, Guardrail and Clear Zone Improvements MM 35.3 to MM 42.0
Results
Less than $8,300,000 est. value
Saco, Scarborough, ME

Maple Street MPI Paving Project
Post-Bid
Saco, ME 04072

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Alfred, Arundel, Biddeford, Lyman, ME 04002

Pavement Milling and Cyclical Pavement Resurfacing
Results
Kennebunk, ME 04043

Pavement Milling and Cyclical Pavement Resurfacing
Results
Limerick, ME 04048

(LCP) Light Capital Paving
Results
Berwick, Cornish, Hollis, Limerick, Newfield, North Berwick, Parsonfield, Shapleigh, ME

On Call Maintenance Paving/Located in Regions 1-5
Results

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,062,000 est. value
Biddeford, Saco, ME 04072

Highway Safety Improvements
Results
Sanford, ME 04073

Merrifield Drive Rehabilitation Project
Results
Kennebunk, ME

Pavement Milling, Ultra-Thin Bonded Wearing Course, with Safety Improvements
Results
Less than $3,404,000 est. value
Cornish, Limington, Parsonfield, Standish, ME 04071

Crack Sealing
Results
Cape Elizabeth, Falmouth, Kennebunk, Lebanon, North Berwick, Old Orchard Beach, Portland, Saco, Sanford, Scarborough, South Berwick, South Portland, Wells, Westbrook, Windham, ME 04101

Last Updated 03/24/2021 09:26 AM
Project Title

Pavement Rehabilitation and Safety Improvements and Exit 32 Southbound Deceleration Lane Construction MM 30.0 TO MM 35.5

Physical Address View project details and contacts
City, State (County) Biddeford, Saco, ME   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,180,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The pavement rehabilitation work consists of milling and filling three 12 foot wide lanes and the median shoulder for both northbound and southbound. Excess material in the median will be removed to restore proper drainage, guardrail height will be adjusted as necessary. A deceleration lane for the Southbound Exit 32 ramp will be constructed. Approximately 490 linear feet of stream channel will be relocated in order to build the ramp; and 0.37 acres of adjacent temporarily disturbed wetlands restored to wetland conditions. Pavement markings, maintenance of traffic and all other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents