Project Title | 28th/29th Street Water Line Replacements |
Physical Address | View project details and contacts |
City, State (County) | Duncan, OK 73533 (Stephens County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $505,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of the Work: A. The Scope of Work for this Project includes the installation of approximately 1,200 linear feet (LF) of 6-inch PVC (DR-18) water line located on 29th Street south of Walnut Ave. and continuing to N. 28th Street to Main St. The Project will include reconnecting existing service lines, replacement of one fire hydrant and one 6-inch gate valve, and abandonment of the existing water line, as well as any associated surface restoration. B. The Scope of Work for this Project includes the installation of approximately 400 LF of 6-inch PVC (DR-18) water line located on the east side of Chisholm Trail Parkway adjacent to the Chisholm Trail Heritage Center. The Project will include reconnecting existing service lines, replacement of one fire hydrant and one 6-inch gate valve, and abandonment of the existing water line, as well as any associated surface restoration. Please direct all questions related to the design of this Project to the Q&A Section. The deadline to ask questions is 10/28/2022 1:30 PM CST SITE TOUR Prospective Offerors may visit the project site at their own discretion. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |