Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Woods Crossing
New Construction - 8,400 SF
Design
$8,000,000 est. value
Greenville, SC

Track And Field Renovations
Renovation
Bidding
Mount Pleasant, SC 29464

Waverly Park
New Construction
Bidding
Pawleys Island, SC 29585

Playground Renovation/Installer
Renovation
Post-Bid
Saluda, SC

Springfield Park Playground
Post-Bid
Mauldin, SC

Newberry High School Track and Field
Results
Newberry, SC 29108

Queen Street Tennis Courts Removal and Replacement
Results
Mount Pleasant, SC 29464

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

The Waterfront
New Construction
Construction
Daniel Island, SC

Cornerstone
New Construction
Conception
Anderson, SC 29625

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

ADA Playground Access Projects At Fifteen (15) Sites
Renovation
Bidding
Taylors, SC

Last Updated 05/14/2021 01:47 PM
Project Title

Springfield Community Park Improvements

Physical Address View project details and contacts
City, State (County) Springfield, SC 29146   (Orangeburg County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $48,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project (A) Playground Equipment: Existing Playground equipment is to be removed and reinstalled in another location of the park. See attached drawing Equipment must be set into place with new concrete footers. Install new border around new location of the playground equipment. Use 2 x 12 treated lumber for border and add brown playground mulch to fill inside of bordered area at approximately 10” depth. Border design must include an ADA compliant ramp at a width of no less than 36” for wheelchair accessibility. Project (B) Perimeter Fencing around Convenience Site: Existing Chain link fence will remain in place. Install new treated 4x4 posts. Install 3 rows of treated 2x4 framing. All posts shall be set in concrete. Install new 8’ corrugated metal panels. Metal tops and sides shall include J-Trim and Corner Trim. Project (C) Perimeter Fencing Front and Side of Property: Remove existing 4’ chain link fence. Posts will remain. Install 450’ of new top rail and chain link at the front of the property. Install 70’ of new chain link fence to tie into existing chain link fence on the front side of the property that connects to the collection site. Install (3) new ADA compliant 4’ walk gates. Install (1) new 10’ drive thru gate.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents