Similar Projects
Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bridgeport, WA 98813

City Hall Entryway and Plumbing Improvements
Renovation, Alteration
Post-Bid
Normandy Park, WA

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

MHR Urgent Plumbing and Electrical
Alteration
Post-Bid
Bonney Lake, WA 98391

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

YNHA- Housing Development
Term Contract
Post-Bid
Wishram, WA

Hazen High School Pool Modernization
Alteration
Results
$9,100,000 est. value
Renton, WA

Center for the Deaf and Hard of Hearing Youth - Mechanical / Plumbing / Electrical
Alteration
Post-Bid
Vancouver, WA 98661

Fountain Restoration Project
Alteration
Results
Fife, WA 98424

Downtown Stadium - Bid Packages
Alteration
Post-Bid
Spokane, WA

2023 Sewer Main Replacement Project
Infrastructure
Results
$790,188 CJ est. value
Walla Walla, WA 99362

District Drinking Water Outlet Mitigation
Alteration
Post-Bid
$50,000 est. value
Vancouver, WA

Fruit Valley Road Stormwater Overflow
Infrastructure
Results
$599,995 CJ est. value
Vancouver, WA 98660

Mount Saint Helens Sediment Retention Structure Crest Raise
Infrastructure
Post-Bid
$25,000,000 CJ est. value
Toutle, WA 98649

Last Updated 07/13/2023 12:24 PM
Project Title

Lakehaven Phase 1 MBR Wastewater Treatment Plant Electrical and Mechanical

Physical Address View project details and contacts
City, State (County) Federal Way, WA 98003   (King County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract includes providing all labor and materials required for the installation of yard piping, submersible pumps, permeate and blowers' equipment, fine screen equipment, sludge dewatering equipment, membrane equipment, flatwork, generator, associated appurtenances, and electrical associated with the Electrical and Mechanical Package for Lakehaven Phase I MBR Wastewater Treatment Plant as more fully described in the Drawings and Specifications. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Question Deadline 07/09/2023

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents