Similar Projects
HVAC System Replacement at Fire Station 7
Bidding
Less than $47,000 est. value
Sandusky, OH 44870

HVAC Replacement and Alterations at Horizon Hills
Alteration
Bidding
Cincinnati, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Post-Bid
Less than $130,000 est. value
Centerville, OH

HVAC Improvements and Upgrades
Post-Bid

Steam Humidification System Repairs & Replacement of Cooling Tower Fill Project
Results
$250,000 to $500,000 est. value
Cleveland, OH 44113

HVAC/R Supplies, Items, Materials and Parts
Results
Cleveland, OH 44114

Cincinnati State - Air Handler Replacement
Alteration
Bidding
Less than $1,800,000 est. value
Cincinnati, OH 45220

Oelman Exhaust Fan Replacement
Post-Bid
Less than $1,092,000 est. value
Dayton, OH 45435

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Design-Build and HVAC Service
Alteration
Bidding
Toledo, OH

Chiller Replacement Eastern Local Schools
Post-Bid
Beaver, OH 45613

OU Southern -Energy Efficiency Phase 3
Results
$350,000 est. value
Ironton, OH 45638

HVAC Maintenance Program
Alteration
Bidding
Dayton, OH 45417

Elementary School HVAC Upgrades
Post-Bid
Morral, OH 43062

MCI Air Balance HVAC Upgrades
Results
Less than $253,000 est. value
Marion, OH

Last Updated 06/25/2021 09:05 AM
Project Title

J041--HVAC Controls Agreement | New/Base+4Oys

Physical Address View project details and contacts
City, State (County) Chillicothe, OH 45601   (Ross County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Veteran-Owned Small Business Set-Aside. Vendor will evaluate the Building Automation System (BAS) monthly to monitor system performance. Vendor will provide software support and software upgrades as needed during the performance period. Vendor will provide complete system database backup during the performance period. Vendor shall provide training and updates with facility personnel related to system controls and functions, software upgrades, history logs and system setpoints. Vendor shall conduct and maintain an inventory of the facility HVAC controls system. Vendor shall provide technical support monthly to implement the preventative maintenance and support services outlined in this document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents