Similar Projects
Furnish Well and Pumping System Maintenance Services for the Monmouth County Division of Reclamation Center and Monmouth County Howell Landfill
Term Contract
Bidding
Tinton Falls, NJ 07753

Portable Diesel By-Pass Pump
Post-Bid
Marlboro, NJ 07746

Furnish Pump and Motor Repair and Purchase of New Pumps and Motors
Term Contract
Post-Bid
Belmar, NJ 07719

Furnishing, Delivery and Installation of Irrigation Retrofit Multi Pump Control System
Results
$24,463 est. value
Lincroft, NJ 07738

Rehabilitation Well No. 8
Results
Freehold, NJ 07728

Hoey Pump Station Force Main Replacement
Post-Bid
Long Branch, NJ 07740

Emergency and Non-Emergency Pump and Motor Repair and Purchase of New Pumps and Motors
Results
Wall, NJ 07719

Y--GATE/225953 - Rehab Replace Well 4 - Sandy Hook NJ
Post-Bid
Sandy Hook, NJ

Furnish Well and Pumping System Maintenance Services for the Monmouth County Division of Reclamation Center and Monmouth County Howell Landfill
Term Contract
Results
$279,450 est. value
Tinton Falls, NJ 07753

Preventative Maintenance and Repair of Fire Suppression Systems, Water Tower and Utility Distribution Systems
Post-Bid
Colts Neck, NJ

Furnishing and Delivery of a Potable Well-Water Monitoring Program
Results
Lincroft, NJ 07738

Furnishing Pump and Motor Repairs and Purchase of New Pumps and Motors
Term Contract
Post-Bid
Long Branch, NJ

Furnishing Pump and Motor Repairs and Purchase of New Pumps and Motors
Term Contract
Results
Long Branch, NJ 07740

Well No. 3 Rehabilitation and Pump Replacement Project
Results
Roosevelt, NJ 08555

Rehabilitation of Well No 13
Results
Freehold, NJ 07728

Last Updated 10/20/2021 02:46 AM
Project Title

Furnishing and Delivery of a Potable Well-Water Monitoring Program

Physical Address View project details and contacts
City, State (County) Lincroft, NJ   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The monitoring program shall include water sampling, water analysis and required reporting to the NJDEP, the Board of Health, and the MCPS. The monitoring program must ensure that the MCPS is in compliance with the New Jersey Safe Drinking Water Act and incorporated Federal Regulations. The contractor shall conduct sampling as required by NJDEP regulations for Public Water Systems and file lab results electronically to the New Jersey Department of Environmental Protection - Bureau of Safe Drinking Water (NJDEP) using the E2 reporting system. The contractor will also sample, test and report results of samples at MCPS non-public system locations. PERIOD OF CONTRACT: The contract will be in effect from January 1, 2022 through December 31, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents