Similar Projects
Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Taxiway A Reconstruction - FP001 - City of Davenport
Infrastructure
Conception
$2,695,450 est. value
Davenport, IA 52806

Terminal Apron Expansion - City of Mason City
Infrastructure
Design
$700,000 est. value
Mason City, IA

Rehabilitate Runway 12/30
Infrastructure
Post-Bid
Charles City, IA 50616

Construct Connector Taxiway FAA AIP
Infrastructure
Post-Bid
$860,000 est. value
Monticello, IA

Runway 7/25 Threshold Relocation
Infrastructure
Results
$529,000 est. value
Iowa City, IA

Rehabilitate Runway 7/25 (East End)
Infrastructure
Results
$128,153 est. value
Iowa City, IA

Taxiway C Reconstruction - FP003 - City of Davenport
Alteration
Conception
$1,292,800 est. value
Davenport, IA 52806

Construct Taxiway and Apron
Infrastructure
Post-Bid
$2,000,000 est. value
Independence, IA 50644

Runway 13-31 Rehabilitation and Lighting Upgrade
Infrastructure
Results
$7,505,185 est. value
Sioux City, IA 51111

48th Street Northeast from Ozark Street to Council Street - City of Cedar Rapids
Infrastructure
Conception
Less than $1,600,000 est. value
Cedar Rapids, IA 52402

Construct Apron and Taxilane for Hangars
Infrastructure
Post-Bid
$360,000 est. value
Iowa City, IA 52246

Construct Runway 18/36 Grading, Paving and Lighting
Infrastructure
Results
$5,500,000 est. value
Denison, IA 51442

Scrip Road Pedestrian Trail - City of Mason City
Infrastructure
Conception
Less than $225,000 est. value
Mason City, IA

Taxiway D Apron and Access Roadway Paving (Phase 3)
Infrastructure
Results
Less than $604,000 est. value
Ankeny, IA 50021

Reported 07/07/2022 12:56 PM
Project Title

Katowski Drive Box Culvert Replacement - City of Cedar Falls

Physical Address View project details and contacts
City, State (County) Waterloo, IA 50701   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value Less than $390,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Katowski Drive Box Culvert Replacement Project will remove and replace the existing steel I-beam bridge with a box culvert. The current bridge is in poor condition with advanced deterioration. As of July 06, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents