Similar Projects
1919 Webster Offices
New Construction, Demolition - 520,000 SF
Conception
$10,000,000 est. value
Oakland, CA 94612

Paradise High Performing Arts Center & 100 Wing Demolition
Demolition
Conception
$12,300,000 est. value
Paradise, CA 95969

Building Demolition at 19 South Central Avenue.
Demolition
Bidding
Lodi, CA 95240

Contracting Trades for Public Works
Infrastructure
Bidding
$5,000 to $100,000 est. value
Kings Beach, CA

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Grapevine-Scale Maintenance
Alteration
Post-Bid
Lebec, CA 93243

Steamers Building Maintenance Platform
Alteration
Results
$170,000 est. value
Sacramento, CA

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Museum Place Redevelopment
New Construction, Addition, Demolition - 1,275,903 SF
Pending Verification
$10,000,000 CJ est. value
San Jose, CA 95113

North Oxford Apartments
New Construction, Demolition - 33,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Los Angeles, CA 90004

Hoover Elementary School Drainage Design
Term Contract, Alteration
Bidding
Burlingame, CA

Dishwasher Replacement
Term Contract
Post-Bid
Fairfield, Travis AFB, CA 94535

Upper Mormon Slough Critical Erosion Repair
Infrastructure
Results
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

Place Reinforced Concrete Pipe and Cured in Place Pipeliner
Infrastructure
Bidding
$490,000 est. value
Elk Creek, Willows, CA

Rack Removal and Warehouse Reconfig/Update
Term Contract
Post-Bid
Edwards, CA 93524

Reported 03/16/2022 12:00 AM
Project Title

Temporary Shoring at CLA Substation

Physical Address View project details and contacts
City, State (County) San Francisco, CA   (San Francisco County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Equipment, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $210,000 to $250,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall include providing all materials, labor, supervision, hardware, tools and equipment necessary for installation of the temporary shoring of CLA substation. The work also includes removal and disposal of all excavated soil, spoils from drilling, etc., design and engineering of soldier pile and lagging shoring system.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents