Similar Projects
U.S. Army Corps of Engineers, Vicksburg District (MVK) Mississippi River and Tributaries (MR&T) Program Multiple Award Task Order Contract(s) (MATOC)
Term Contract
Design
$99,500,000 CJ est. value
Vicksburg, MS 39183

Washington Street Rehabilitation
Infrastructure
Bidding
$1,402,000 CJ est. value
Vicksburg, MS 39183

NRCS Erosion Control Project - Farmer Street and Clover Lane Stabilization
Infrastructure
Post-Bid
$400,000 est. value
Vicksburg, MS 39183

Freetown Road Roadway and Drainage Improvements
Infrastructure
Post-Bid
$300,000 est. value
Vicksburg, MS 39183

2021 NRCS Erosion Control - 4 Sites
Infrastructure
Results
Vicksburg, MS

Erosion Control Project (NRCS) Union Avenue
Infrastructure
Results
$200,000 est. value
Vicksburg, MS

Warren County Jail Construction
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Vicksburg, MS 39183

2023 Warren County Gravel Road Surfacing Project
Infrastructure
Results
$4,743,081 CJ est. value
Vicksburg, MS 39183

Letourneau Landing Boat Ramp Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Vicksburg, MS 39180

Site Work and Concrete Paving
Infrastructure
Post-Bid
$948,575 CJ est. value
Vicksburg, MS 39183

Overlay on Roads A - C
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Vicksburg, MS 39183

Traffic Safety Improvements County-Wide Project
Infrastructure
Post-Bid
$758,000 CJ est. value
Vicksburg, MS 39183

Soldier Pile Stabilized Embankments and Drainage Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Vicksburg, MS 39183

2022 Street Paving Project - Group 1
Infrastructure
Post-Bid
$400,000 CJ est. value
Vicksburg, MS 39183

Wheels on Hills Cycling Route
Infrastructure
Post-Bid
$300,000 CJ est. value
Vicksburg, MS 39183

Last Updated 10/11/2023 10:11 AM
Project Title

1-20 Clear Creek Bridge NO. 12.0A & 12.0B Bank Stabilization

Physical Address View project details and contacts
City, State (County) Vicksburg, MS 39180   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bank Stabilization on I-20 over Clear Creek (Bridge Nos. 12.0A & 12.0B), known as Federal Aid Project No. NHPP-0020-01(253) / 108397301 in Warren County Project completion: 98 Working Days Value Estimate Range - $1,000,000 - $5,000,000 For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. Bid Bond, Signed or Countersigned by a Mississippi Resident Agent or Qualified Non-resident Agent, With Power of Attorney Attached or on File With the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for Five (5%) Percent of Bid, Payable to State of Mississippi, Must Accompany Each Proposal. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. The attention of bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. MSDOT - 09 - Bank Stabilization - I-20 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents