Similar Projects
Silver Sands School - Half Cent Sales Tax Capital Program - Okaloosa County School District
Infrastructure, Renovation
Conception
$1,000,000 CJ est. value
Fort Walton Beach, FL 32548

Silver Sands School - Half Cent Sales Tax Capital Program - Okaloosa County School District
Infrastructure, Renovation
Conception
$1,000,000 CJ est. value
Fort Walton Beach, FL 32548

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Addition/Alteration and Repair Child Development Center, Building 90353
Addition, Demolition, Renovation, Infrastructure - 1,929 SF
Post-Bid
$5,000,000 CJ est. value
Hurlburt Field, FL 32544

RFP Design - Construction of a New Fire Station
New Construction, Infrastructure
Post-Bid
$813,000 CJ est. value
Holt, FL 32564

Redwood Avenue Sidewalk Improvements
Infrastructure
Results
$900,000 to $950,000 est. value
Niceville, FL 32578

Asphalt Paving Annual Bid
Term Contract, Infrastructure
Results
Fort Walton Beach, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Crestview High School Classroom Addition and Cafeteria Expansion, Laurel Hill School Classroom Addition and Multipurpose Building Renovation
Addition, Demolition, Renovation, Infrastructure
Construction
$20,000,000 CJ est. value
Crestview, FL 32536

Edge Elementary School - Building Refresh - Half Cent Sales Tax Capital Program - Okaloosa County School District
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Niceville, FL 32578

Lance C. Richbourg School - Half Cent Sales Tax Capital Program - Okaloosa County School District
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Crestview, FL 32536

Pickleball Courts - RC127 - City Of Destin
Infrastructure
Conception
$340,000 CJ est. value
Destin, FL 32541

Murphy USA #8667 / Fort Walton Beach
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Fort Walton Beach, FL 32548

Eglin Construct Range Road 218 Bypass
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Eglin AFB, FL

Last Updated 01/19/2023 12:02 PM
Project Title

City of Fort Walton Beach Recreation Complex Addition "Phase 3" - City of Fort Walton Beach

Physical Address View project details and contacts
City, State (County) Fort Walton Beach, FL 32548   (Okaloosa County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct 4 Lighted Multipurpose Athletic Fields, Parking, Restroom building, storage, and exercise trail. As of January 19, 2023, this project is included in the City of Fort Walton Beach's FY 2023-2027 Capital Improvement Program (CIP). Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents