Similar Projects
Last Updated | 08/11/2022 12:04 PM |
Project Title | Safety Project/Milling and Resurfacing/Drainage Improvements/Base Work |
Physical Address | View project details and contacts |
City, State (County) | Molino, FL 32577 (Escambia County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,730,914 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Escambia Road Name: SR 95 (US 29) Limits: S of Sr 4 to the Alabama St Line Project(s): 21859425201(*) Federal Aid No: D322008B Project(s): 21859425601 Federal Aid No: N/A Total Roadway Length: 1.223 Miles Contract Days: 355 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.223 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Other The improvements under this contract, FPID 218594-2-52-01 consist of milling and resurfacing SR 95 (US 29) South of SR 4 to the Alabama State Line. The milling and resurfacing segments include signalization improvements, sidewalk, minor drainage improvements and curb ramps. Other improvements include reconstructing a portion of SR 95, the reconstruction portion of SR 95 will include re-alignment of the roadway, removal of existing concrete roadbed, asphaltic concrete, base and removal and reconstruction of the drainage collection system, curb and gutter, sidewalk driveway modifications and curb ramps. FPID 218594- 2-56-01 includes the removal and relocation of existing underground utilities from SR 95 (US 29) South of SR 4 to the Alabama State Line. Utility relocations includes potable water, natural gas, and gravity sanitary sewer. FPID 218594-2-56-01 includes adjustments of existing valves and man-holes. All work to be done in Escambia County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 004 Safety Project/Milling and Resurfacing/Drainage Improvements/Base Work |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |