Similar Projects
71st Admin 7.5 Ton A/C Replacement
Alteration
Bidding
$2,000 to $3,000 est. value
Fayetteville, NC 28304

Remove and Replace Two Existing Package A/C Units at Elizabeth Cashwell Elementary School
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28306

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Remove and Replace Two Existing A/C Units and One Existing Split System at Mary Mcarthur Elementary School
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28304

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Crown Boiler Retubing and Burner Upgrade
Infrastructure
Bidding
Fayetteville, NC 28306

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

South View Middle School Classroom Area HVAC Upgrade
Results
Hope Mills, NC 28348

Mary Mcarthur Elementary School AC Replacements for Buildings 2,3, and 4
Alteration
Bidding
Fayetteville, NC 28304

Phase 2 Classroom HVAC Upgrade at South View Middle School
Post-Bid
Less than $500,000 est. value
Hope Mills, NC 28348

Furnish and Deliver Trenton Products Walk-In Cooler and Freezer Systems
Results
Less than $14,397 est. value
Bonnie Doone, NC 28303

Last Updated 08/24/2021 04:46 PM
Project Title

William H. Owen office A/C Unit replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28304   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000 to $30,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and dispose of the existing 3 ton package unit. The contractor shall install a new 3 ton package heat pump with a new thermostat. The contractor shall supply new disconnects with new conduit and power wire from the new disconnect to the new unit. All duct work shall be sealed with mastic. The duct shall be wrapped and covered with a metal shroud. All work will be done by code. The contractor shall be responsible for all permits and fees

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents