Similar Projects
Concrete Redi-Mix, Sand And Mortar
Alteration
Bidding
GA 30506

Concrete Pad
Post-Bid
Savannah, GA

Concrete Materials
Term Contract
Post-Bid
GA

Foundation Restoration
Results
Watkinsville, GA 30677

Cumming City Center Building E, F, G, H, L - Concrete
Results
Less than $2,083,000 est. value
Cumming, GA 30040

Concrete Mix - Annual Contract
Post-Bid
Warner Robins, GA

19.611 Miles of Concrete Rehabilitation and Pavement Marking Upgrades on I-675/SR 413 North and South Bound Beginning at I-675/I 75 Split and Extending to SR 407
Results

Rock - Annual Contract
Post-Bid
Warner Robins, GA

2021 Concrete Repair Project #1
Results
Johns Creek, GA

Demolition Services
Post-Bid
Perry, GA 31069

Hot Asphaltic Concrete
Results
Cumming, GA

As Needed Concrete
Alteration
Post-Bid
GA

On Call Concrete And Retainer Walls
Results
Decatur, GA

Construct Canopy and Concrete Work
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Savannah, GA

Detention Center Polished Concrete Corridors
Results
Less than $14,742 est. value
GA

Reported 03/19/2022 12:00 AM
Project Title

Concrete Material Bay Storage

Physical Address View project details and contacts
City, State (County) Villa Rica, GA   (Carroll County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SLAB: To pour and install an 80’ Wide X 20’ Deep slab for the material bays to be built upon. The slab should be 6” thick with 3000 PSI concrete. -6”x6” welded wire mesh will be used in the slab. There should be at least a 4” thick gravel base, beneath the slab. There should be a slight slope from the back of the slab to the front, so that water may run off. The slab will be 6” above the ground surface, beginning at the surface. There should be footings poured with the slab. Footings shall be 16” wide X 18” deep. #4 rebar should be used in the footings. BAY WALLS: There should be 6 total walls to be poured and installed for the material bays. This will create 5 total bays for material storage. The two exterior bay walls will be 20’ deep X 8’ Tall in the rear and 6’ tall in the front. This will allow a slope on top of the walls from rear to front. The 4 middle bays will be 19’ deep X 8’ tall in the rear and 6 ‘tall in the front. This will allow a slope on top of the walls from rear to front. There will be a 1’ gap from the rear of the wall to the cinder block building. (see drawings for clarification or contact Nic Griffin.) All walls will be will be steel reinforced with #5 rebar on 2’ center. All walls will be 1’ thick.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents