Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 est. value
Forest Grove, OR 97116

Bagan Park - 92067 - City Of Tigard
Infrastructure
Conception
$935,000 CJ est. value
Tigard, OR 97223

Southwest Division Street Culvert Replacement Project
Infrastructure
Design
$840,000 CJ est. value
Aloha, OR 97007

Southwest Division Street Culvert Replacement Project
Infrastructure
Design
$840,000 CJ est. value
Aloha, OR 97007

Aquifer Storage and Recovery (ASR) 3 Facility
New Construction, Infrastructure
Bidding
$6,140,000 CJ est. value
Beaverton, OR 97005

RFP CM/GC - Aloha High School Office Relocation
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Beaverton, OR 97007

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Water Transmission Pipeline
Infrastructure
Post-Bid
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

403 Black Creek Group Coffee Creek Industrial
New Construction, Infrastructure - 148,279 SF
Pending Verification
$55,000,000 CJ est. value
Sherwood, OR 97140

Amberglen Alta 2 Mixed-Use
New Construction, Infrastructure - 16,000 SF
Pending Verification
$230,000,000 CJ est. value
Hillsboro, OR 97123

Nick Wilson Memorial Plaza - 97027 - City Of Tigard
New Construction, Infrastructure
Conception
$650,000 CJ est. value
Tigard, OR 97223

North Dakota Street: Fanno Creek Bridge
New Construction, Infrastructure
Design
$3,326,890 CJ est. value
Tigard, OR 97223

Beaverton- Hillsdale Highway Water Main Replacement
Infrastructure
Bidding
$2,600,000 CJ est. value
Portland, OR 97225

Last Updated 08/18/2022 03:34 PM
Project Title

Red Rock Waterline Relocation - 96046 - City Of Tigard

Physical Address View project details and contacts
City, State (County) Tigard, OR 97223   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $867,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Abandon the existing 12-inch waterline running parallel to Red Rock Creek in place and connect the dead-end waterlines in Wall Street and Tech Center Drive to create a system loop. In doing so, this will delete a waterline railroad crossing. Connect the existing 12-inch waterline to Milton Court and to the existing 12-inch waterline in Tech Center Drive, which will add a waterline railroad crossing. As of August 18, 2022, this project is included in the City of Tigard FY 2022-2023 CIP. Information regarding design completion and firm construction timelines has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents