Similar Projects
Paving of Athletic Field Path
Post-Bid
Frederick, MD 21705

Miscellaneous Roadway Structure Repairs at Various Locations in Carroll, Frederick, and Howard Counties
Results
$1,000,001 to $2,500,000 est. value

Cunningham Falls State Park - Resurface Park Office, Maintenance Facility, Houck Campground
Results
Less than $100,000 est. value
Thurmont, MD

Orndorff Road to College Lane Geometric Improvements
Results
$2,500,001 to $5,000,000 est. value
MD

Butterfly Lane Relocation Project - Construction
Results
Frederick, MD

Combined Paving and Concrete Work
Results
Frederick, MD

Design-Build Linganore Water Treatment Plant Access Road
Results
Frederick, MD

MD 180 Jefferson Pike 4 Lane Urban Reconstruction West of Swallowtail Drive to I-70 Ramp Structure No 10140 in Frederick County
Results
$10,000,001 to $15,000,000 est. value
MD

Patching and Repair of Various Frederick County Roadways - FY 2019
Term Contract
Results
$1,000,001 to $2,500,000 est. value
MD

Kaetzel Transfer Station Retaining Wall
Results
$500,000 est. value
Knoxville, MD 21758

Walkersville High School Asphalt Paving Modifications and Improvements
Results
Walkersville, MD

Main Street (Rt17) from Cedar Street to Wolfsville Road (Rt 17) Improvements
Results
$1,700,000 est. value
Myersville, MD

Various Locations in District 7 (Carroll, Frederick, and Howard Counties) Chip Seal Surface Treatment Area Wide
Results
$1,000,001 to $2,500,000 est. value

Surface Coat of Various Frederick County Roadways - FY 2019
Results
$1,000,001 to $2,500,000 est. value
MD

Ballenger Creek Trail Section 1 and Spur Trail
Results
Frederick, MD

Last Updated 03/01/2019 05:34 AM
Project Title

MD 180 Jefferson Pike at Mt Zion Road Geometric Improvements - Roundabout in Frederick County

Physical Address View project details and contacts
City, State (County) MD   (Frederick County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,001 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The construction of a roundabout at the intersection of MD 180 (Jefferson Pike) at Mount Zion Road. Beginning approximately 625 feet west of the intersection and extending in an Easterly direction along MD 18 0 (Jefferson Pike) for a total distance of 0.275 miles. Beginning approximately 400 feet south of the intersection and extending in a Northerly direction along Mount Zion Road for a total distance of 0.166 miles. The work will consist of the following: fine milling, resurfacing and wedge and leveling of the existing roadway, reconstruction and widening of MD 180 and Mount Zion Road, construction of curb and gutter and curb, installation of traffic barrier w beam, construction of central and splitter islands with traffic bearing decorative portland cement concrete, construction of two (2) bioretension stormwater management facilities,installation of pipe, end sections, endwalls, manholes, inlets and riprap, installation of a detour route, installation of pavement markings and signs, installation of LED light poles and luminaires, conduit, cable manholes and base mounted metered service pedestal,removal of an Intersection Control Beacon (ICB), strain poles and associated equipment,installation of trees, shrubs and grasses.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents