Last Updated | 10/13/2023 06:34 PM |
Project Title | Newport Beach Library Lecture Hall |
Physical Address | View project details and contacts |
City, State (County) | Newport Beach, CA 92660 (Orange County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Library - Public, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $19,468,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work necessary for the completion of this contract consists of Selective site and building demolition as noted on the Demolition Plan; includes the existing courtyard wall that parallels Avocado Avenue, a portion of the library building pedestrian arcade, the courtyard paving and landscaping, the pedestrian access bridge from Avocado Avenue and a portion of the existing sidewalks and parking lot. The Work includes all site and building construction as indicated in the Contract Documents. The Work includes new utility systems, site paving, curbs, ramps, pavement markings, parking, signage, fences and gates, site lighting and other site features to extent indicated in the Contract Drawings. The Work includes the construction of a new single story 9,814 SF library lecture hall building and associated site work. The Building is to be Type VB Fully-Sprinklered Construction. Additionally, the work includes the construction of a trash enclosure, site walls and security gates. As indicated within the Contract Documents, the Work Includes, but is not limited to: a) New building structures including all exterior finishes, doors, windows, storefronts, curtain wall, covered walkway, interior finishes, casework, specialties and built-in equipment. b) All concrete paving, landscaping and irrigation system. c) Built-in Audio and Visual Equipment. d) Signage and Graphics to the extent indicated on the Drawings and in the Project Manual, Signage Program dated September 6, 2023. e) Wet pipe fire suppression system and fire detection system. f) Plumbing and HVAC (heating, ventilating and air-conditioning) as indicated on the Plumbing, Mechanical and Electrical Drawings. g) Communication equipment, conductors and instruments. Work under the building construction contract shall include conduits, junction boxes, outlet boxes, backboards, conductors and conduit ties between backboards and in the Specifications. h) All infrastructure including conduit, back-boxes, hardware and equipment for Access Control System. i) All underground utilities j) Reporting and maintaining all SWPPP and WQMP. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $2,500 Per Day Estimated Bid Value $18,500,000.00 Question Deadline 10/02/2023 at 1:00 PM PT All Requests for Information shall be submitted |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 9,814 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |