Similar Projects
Red Cliff Scattered Sites 2022 - Individual Wells and Water Systems
Infrastructure
Bidding
WI

Well 18 Treatment
Post-Bid
Less than $160,000 est. value
Madison, WI 53713

Well Station No. 5 HMO Treatment Facility & Building Modifications
Post-Bid
$2,907,000 est. value
Pewaukee, WI 53072

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

Municipal Well 4 - Well Construction
Results
Wausaukee, WI 54177

Drilling Observation Services
Renovation, Term Contract
Post-Bid
Oconomowoc, WI 53066

2020 Bypass Pump Rehabilitation
Results
Milwaukee, WI

Well 10 Maintenance and Rehabilitation
Infrastructure
Post-Bid
Burlington, WI 53105

Sun Prairie Utilities Test Well for Well 10
Results
Sun Prairie, WI

Well Station No. 5 Reservoir Roof Repair and Pump Replacement
Infrastructure, Alteration
Post-Bid
$300,000 est. value
Pewaukee, WI

Pump House No.10 Improvements
Results
Muskego, WI

Pump Maintenance
Infrastructure
Post-Bid
North Prairie, WI 53153

2020 Grinder, Pump Station 17
Results
Madison, WI

WWTP Primary Sludge Pumps and Components
Infrastructure
Post-Bid
Waupaca, WI

2021 Water System - Well Drilling - Contract A
Term Contract
Results
Arlington, WI

Last Updated 03/24/2022 10:59 AM
Project Title

Booster Pump #1 Repair 2022

Physical Address View project details and contacts
City, State (County) Hudson, WI 54016   (Saint Croix County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $59,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Execution: • Prior to pump removal the contractor shall record the gallons per minute pumping, the voltage, the amp draw, the Hz at which the pump is pumping if (VFD), and the vibration of the upper and lower motor frame. • Remove motor, shaft, pump, tail piece and right-angle drive. • Remove Continental natural gas engine from concrete base. • Reinstall motor, pump shaft, pump, and tail piece • The booster pump motor shall be loaded onto a Hudson Public Utilities Vehicle. We will have a local motor shop examine the electric motor. • Disassemble, clean, and inspect all components for signs of wear and deterioration. • A new head shaft will need to be made to accommodate the right-angle drive removal. • Make recommendations the Hudson Public Utility for needed repairs or replacement of parts. No repairs shall be made without prior approval from the Utility. • All components shall be within manufactures specifications and tolerances before reinstation • Disinfect booster pump prior to installation. • After reinstallation, the contractor shall record the gallons per minute pumping, the voltage, the amp draw, the Hz at which the pump is pumping if (VFD), and the vibration of the upper and lower motor frame. • Work to be completed May 1, 2021. Materials Furnished-Contractor: Replacement parts furnished by the contractor must be of the same manufacturer OEM. Contractor shall provide cost based on per unit. Debris Clean-Up: The contractor will be responsible for removing all debris from the site and clean affected areas. The contractor will keep the premises free of debris and unusable materials resulting from their work as the work progresses, or upon request by the faculty representative. The contractor will remove such debris and material from the site. The contractor will leave all affected areas as they were prior to beginning of project. Booster pump information: • 30 horsepower 6” vertical turbine pump • There is not roof access for pump removal. • Pump setting flooded suction 4’2” deep • Pump is a Lane Model 62H-1677 3 stages designed for 600 GPM + • Last service date was in 2002

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents