Project Title | Z2qa--Alternate Walkway |
Physical Address | View project details and contacts |
City, State (County) | Chelmsford, MA (Middlesex County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $25,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes: 1. Demolition of the existing pavers, grading, installation of a new sidewalk, and landscaping. 2. Contractor shall provide all labor, supplies, transportation, and equipment required to perform work. D. Work to be included but not limited to: The contractor shall provide a new sidewalk that complies with Massachusetts Architectural Access Board regulations (https://www.mass.gov/law-library/521-cmr) and ADA requirements. It shall be of similar construction to the adjacent existing ninety-degree sidewalk. After new sidewalk is installed apply stone borders on both sides of new sidewalk and weed barrier/edging. Contractor s Responsibilities: The contractor is responsible to provide a copy of their COI prior to work being performed. COI must list RAM-10 Industrial, LLC and Ram Management CO., LLC as additional insured. The contractor is responsible for verifying all site conditions prior to performing any work under this contract and follow all guidelines and standards. Before opening any excavation, it is the contractor s responsibility to verify the existence of underground utilities. Contractor shall verify all site dimensions prior to demolition and construction. The contractor is responsible for submitting a list of parts and materials to the COR for approval prior to use. To include: Concrete compressive strength Stone used Sealant used The contractor is responsible for protecting adjacent structures, equipment, vehicles, pedestrians, and vegetation while performing under this contract. The contractor is responsible for replacing concrete walkways, landscape, grass, asphalt, and any other damages caused by the contractor during this project. The contractor shall be responsible for the actions of all individuals provided to work under this contract. If in the event damages arise from work provided by contractor personnel, the contractor shall be responsible for all resources necessary to remedy the incident (including damages to landscaping) at no additional cost to the Government. The contractor shall adhere to all Occupational Safety and Health Administration (OSHA) regulations, as well as the safety regulations of the CMOP. The contractor shall ensure the worksite is properly cleaned up during construction and when work is complete. The contractor shall dispose of all residues off-site in strict accordance with all applicable Federal, State and Local regulations. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |