Similar Projects
Regrading and Resurfacing Project
Infrastructure
Bidding
$359,000 est. value
Cheyenne, WY

Kluver Road PRV Project
Infrastructure
Bidding
$300,000 est. value
Gillette, WY 82716

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Congestion Mitigation and Air Quality Improvement Project for Four Road Projects
Infrastructure
Bidding
$300,000 est. value
Newcastle, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Cheyenne Streets - Warren Ave (Lincolnway - 24th)
Infrastructure
Results
Cheyenne, WY

USFS Cold Springs Road Improvement, Hyatteville, Wy
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Buffalo, Sheridan, WY 82834

Greybull - Lovell (US 310 / WYO 789)
Infrastructure
Results
Greybull, Lovell, WY

Reported 06/10/2022 12:00 AM
Project Title

Construction of Asphalt Pavement Improvements

Physical Address View project details and contacts
City, State (County) Evanston, WY   (Uinta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Materials Include: Approximately, 2,229 tons of Hot Mix Asphalt Pavement (HMAP), 1,000 CY of roadbase, 9,907 SY of asphalt removal, tack coat, 6 water valve grade rings, and 4 sewer manhole grade rings. Street cleaning, asphalt removal, weed removal and surface preparation, traffic control, placement and compaction of plant mix asphalt, pavement re-striping as needed, adjustment of sewer manhole covers and water valve boxes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents